FOB Price
Get Latest Price850 ~ 1850 USD / Set ( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
-
FOB Price:
850 ~ 1850 USD / Set ( Negotiable )Get Latest Price
Place of Origin:
China
Price for Minimum Order:
850 per Set
Minimum Order Quantity:
1 Set
Packaging Detail:
Wooden case
Delivery Time:
10 days after 30% advanced payment finished
Supplying Ability:
99 Set per Week
Payment Type:
T/T, Western Union
Product Group :
Contact Person Mr. Daniel
Crane industrial park,, Changyuan, Henan
Model | Working platform size(mm) | Capacity | Height(M) | Size(mm) | deadweight |
ESJ*0.***1 | ***0****0 | **0kg | *1 | ***0****0****0 | ***0 |
ESJ*0.***2 | ***0****0 | **0kg | *2 | ***0****0****0 | ***0 |
ESJ*0.***4 | ***0****0 | **0kg | *4 | ***0****0****0 | ***0 |
ESJ*0.***6 | ***0****0 | **0kg | *6 | ***0****0****0 | ***0 |
ESJ*0.***8 | ***0****0 | **0kg | *8 | ***0****0****0 | ***0 |
No. | Stoppage | Reason | Elimination methods |
---|---|---|---|
1 | Working plate is unable to lift or cant lift |
1.Overload 2.Return valve is not closed hand pump check valve stuck, return failure hand pumps, gear pumps serious oil spill. 3.Gear pump is damaged,oil has no pressure. 4.Hydraulic oil shortage 5.Short circuit 6.Blocking filter 7.Supporting valve or solenoid switching valve works failure A.Input voltage of electromagnet coil cant reach **0V. B.electromagnet coil burnt out. C.Valve stuck |
1.Lighten
load. 2.Tighten the oil return valve 3.Unscrew the oil port bolt valve, Overhaul, clean 4.Replace clean hydraulic oil. 5.Replace pump seals 6.Replace gear pump 7.Add enough hydraulic oil 8.Check contacts and fuses, etc. 9.Replace or clean *0.Repair or replacement |
2 | Oil leak |
1.loose
connection 2.Sealing ring damage |
1.Rugged spilt oil at the
joints 2.Repair or replacement |
3 | Table decline |
1.Valve closed
lax 2.Connection part between tube or valve oil leakage. |
1.Tighten the valve or
repair 2.Check and replace |
4 | Table drop not smoothly |
1.Load overload, causing deformation of
rail bracket. 2.Severe partial load 3.Rail brackets and other severe deformation caused by the accident. 4.Clip gas oil. 5.Dirty oil. |
1.Lighten the load for
maintenance 2.Adjust the load center of gravity 3.Overhaul 4.Add enough hydraulic oil 5.Replace hydraulic oil |
Country: | China |
Model No: | - |
FOB Price: | 850 ~ 1850 / Set ( Negotiable ) Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | 850 per Set |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | Wooden case |
Delivery Time: | 10 days after 30% advanced payment finished |
Supplying Ability: | 99 Set per Week |
Payment Type: | T/T, Western Union |
Product Group : | Scissor Lift |