Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 11 Million Importers & Exporters globally. Join Now |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
15KG Light Steel Rail
Next

15KG Light Steel Rail

FOB Price

Get Latest Price

|

10 Ton Minimum Order

Country:

China

Model No:

-

FOB Price:

Get Latest Price

Place of Origin:

China

Price for Minimum Order:

-

Minimum Order Quantity:

10 Ton

Packaging Detail:

Steel Wire Rope

Delivery Time:

7-10 days

Supplying Ability:

2000 Ton per Month

Payment Type:

T/T

Product Group :

-

Contact Now
Free Member

Contact Person Andy

Contact Now

Product Specification

Product Description

Material*5Q  Q**5 

Weight*5.*0Kg/m 

Length6m 8m 

StandardGB*********2

PRODUCT PARAMETERS






























 

Parameters
type weight (kg/m) material length (m)
*5kg *5.*0 Q**5/*5Q **8m
rail height (mm) bottom width (mm) head width (mm) web thinkness (mm)
*9.*7 *9.*7 *2.*6 8.*3

 




































































 
Light Steel Rail size Rail Height Bottom Width Head Width Web Thickness Weightkg/m
8kg *5 *4 *5 7 8.*2
*2kg *9.*5 *9.*5 *8.1 7.*4 *2.2
*5kg *9.*7 *9.*7 *2.*6 8.*3 *5.2
*8kg *0 *0 *0 *0 *8.*6
*2kg *3.*6 *3.*6 *0.8 *0.*2 *2.3
*4kg **7 *2 *1 *0.9 *4.*5
*0kg **7.*5 **7.*5 *0.*3 *2.3 *0.1

 

 

 

Product Introduction and application 

Steel rail, also called rail track, steel track, is the main component of railway track. Its function is to guide the wheels of the locomotive, bear the great pressure of the wheel, and keep the stability of railway transportation. The rail must provide continuous, smooth and minimum rolling surfaces for the wheels. In electrified railway or automatic block section, rail can also be used as an orbital circuit.

 

The steel rail in china are divided into Crane rail, Heavy rail and light rail.

Light rail is divided into GB and the ministry standard (YB metallurgical standard). There are 8kg, *2kg, *5kg, *8kg, *2kg, *4kg, *0kg. 

The light rail is mainly used for the laying of temporary transportation lines and light locomotive lines for forest areas, mining areas, factories and construction sites.

 

Country: China
Model No: -
FOB Price: Get Latest Price
Place of Origin: China
Price for Minimum Order: -
Minimum Order Quantity: 10 Ton
Packaging Detail: Steel Wire Rope
Delivery Time: 7-10 days
Supplying Ability: 2000 Ton per Month
Payment Type: T/T
Product Group : -

Send a direct inquiry to this supplier

To:

Andy < Hebei Yongyang Steel Sales Co, Ltd >

I want to know: