FOB Price
Get Latest Price2.89 ~ 10.1 USD / Piece ( Negotiable )
|100 Piece Minimum Order
Country:
China
Model No:
-
FOB Price:
2.89 ~ 10.1 USD / Piece ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
2.89 per Piece
Minimum Order Quantity:
100 Piece
Packaging Detail:
One set in a polybag and paper box;25 sets in a standard corrugated carton or Customized
Delivery Time:
3 days for samples, 5-15 days for mass production
Supplying Ability:
100000 Piece per Month
Payment Type:
T/T, L/C, D/P, Western Union, Money Gram
Product Group :
Contact Person Mr. peter
Nanri Industry Zone, Jiaxing, Zhejiang
T5 led office lighting performance characteristics:
T8 Fluorescent tube replacement |
Replace *8/*0w |
Replace *7/*0w |
Replace *6/*0w |
Replace *8/*5w |
Power : |
9w |
*4w |
*8w |
*4w |
Product size |
2FT |
3FT |
4FT |
5FT |
LED Chip type |
Epistar SMD***5 |
Epistar SMD***5 |
Epistar SMD***5 |
Epistar SMD***5 |
CRI |
the led test report for each piece smd***5 is **7lm/w Ra=*5. |
|||
Light Output(lm) |
||||
Color temp |
***0 to ***0K |
***0 to ***0K |
***0 to ***0K |
***0 to ***0K |
AC voltage |
AC*****0V |
AC*****0V |
AC*****0V |
AC*****0V |
Power factor |
>0.9 |
>0.9 |
>0.9 |
>0.9 |
Power source: |
constant-current driver |
constant-current driver |
constant-current driver |
constant-current driver |
Long Lifespan |
*0,**0hrs |
*0,**0hrs |
*0,**0hrs |
*0,**0hrs |
Power Efficiency: |
≥*8% |
≥*8% |
≥*8% |
≥*8% |
Brightness Degradation: ***0hours |
<4% |
<4% |
<4% |
<4% |
Material |
Aluminum + PC |
Aluminum + PC |
Aluminum + PC |
Aluminum + PC |
Quality Warranty |
3 or 5 years |
3 or 5 years |
3 or 5 years |
3 or 5 years |
T5 led office lighting installation instruction and specification,
Special attention:
1) Dont use the product in outdoor enviroments
2) Please switch off and disconnect power before installation
3) The product is suitable for ceiling & wall mounting
4) Dont touch the lamp when the power is switched on or few minutes after switching off
Please let me demonstrate how to save the energy for you:
Type |
Voltage (V) |
Current (A) |
Power (W) |
Power Factor (%) |
Luminous Efficiency (LM/W) |
Color Rendering Index |
*0 hours per day***0days |
T5 *8W |
**0 |
0.*9 |
*8 |
*0% |
**0 |
≥*2 |
*4kw.h(saving *4kw.h) |
T8 *6W |
**0 |
0.*6 |
*6 |
*6% |
*2 |
≤*5 |
**8kw.h |
Example:The company has ***0 peices of T8, They work ***0 hours per year,T5 can save *****0kw.h for two years( 2year×***0pcs×*4kw.h=*****0kw.h). |
Please try earlier due to its energy saving and environmental protection
Shipping Options:
1. By express: The dispatch time is about 5 days and our factory will find an economical courier for you such as DHL, UPS, TNT, FEDEX et.
2. Air Freight: It is more economical than express when you order more than **0kgs
3. Sea freight: We will update ocean freight later once we know to which sea port goods will be delivered
4. Agent designated by clients: Please tell us the contact details of your shipping agent/forwarder
Certification and Warranty:
The factory has the certificate of CE,ROHS,CCC and promises that we will exchange the bad quality goods which can't run one whole year under the normal working conditions. We can also promise three or five years
Country: | China |
Model No: | - |
FOB Price: | 2.89 ~ 10.1 / Piece ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 2.89 per Piece |
Minimum Order Quantity: | 100 Piece |
Packaging Detail: | One set in a polybag and paper box;25 sets in a standard corrugated carton or Customized |
Delivery Time: | 3 days for samples, 5-15 days for mass production |
Supplying Ability: | 100000 Piece per Month |
Payment Type: | T/T, L/C, D/P, Western Union, Money Gram |
Product Group : | Led Tube |