FOB Price
Get Latest Price( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
-
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
HARBIN/SHANGHAI
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
Standard Packing.
Delivery Time:
2 Month After Payment.
Supplying Ability:
50 Set per Month
Payment Type:
T/T, L/C, D/A
Product Group :
-
Contact Person feng
No.21, Xinjiang East Road, Haping Road Centralized Industrial Park , Harbin Development Zone , Harbi, Harbin, Heilongjiang
We are designs and manufacture the ancillary equipment for QDA*0,
such as soundproof enclosure,gas-intake and exhaust noise eliminating
system,air-intake and exhasut noise eliminating system.
Also manufacture the chassis for the generator set.
Scope of Supply
1.Ancillary equipment for gas turbine set series
Develop,design,manufacture and install various kinds of noise elimination
equipment of gas turbine generator sets;soundproof enclosures;air-intake
system;exhaust silencers;exhaust system;chassis;air intake and exhaust
systems and silencers inside cooling box.
2.Ancillary equipment for diesel generator set series
Develop,design,manufacture and install various kinds of noise elimination
equipmet of diesel generator sets;soundproof enclosure;air intake silencers;
exhaust silencers;chassis;smoke ejector silencer.
3.Noise elimination equipment ,device or components
Develop,design,manufacture and install various kinds of else noise elimination
equipment,device or components,like soundproof door soundproof window,
acoustic screen,silencer,soundproof room,noise elimination elbow.
4.Noise eliminating program/Non-standard components manufacture
According to the requirements of noise control in air intake and exhaust system,
flow resistance loss indicator,temperature,environment,the customer's requirements
or some other parameters,we do some noise tests design the program and drawings,
manufacture every required components absorbent wall,high temperature and we also
in charge of transportation ,installation and construction.
Country: | China |
Model No: | - |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | HARBIN/SHANGHAI |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | Standard Packing. |
Delivery Time: | 2 Month After Payment. |
Supplying Ability: | 50 Set per Month |
Payment Type: | T/T, L/C, D/A |
Product Group : | - |