FOB Price
Get Latest Price|
- Minimum Order
Country:
China
Model No:
Alloy Steel Pipe
FOB Price:
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
as customers requirement
Delivery Time:
2weeks/as per customerâï¿
Supplying Ability:
-
Payment Type:
-
Product Group :
-
Contact Person Ms. linda
xihu road, Tianjin, Tianjin
steel pipe
1SIZE:1/2"**2"
2Standard:ASTM,GB,DIN,JIS
3Grade:A**5 P*1,P*2,P*2,P5,*0CrMo**0,T*1/P*1,P*2
Category |
Grade |
standard |
SIZE |
application |
Alloy steel Pipe |
*2Cr1MoVG P*1/P*2/P*2 T*1/P*1 Cr5Mo T9/P9 WB*6 *5CrMoG *0CrMo**0 |
GB***7/GB***0 GB/T***8/GB***9 GB/T***3(ISO**9:***1) ASME B*6.*0M:***6 ASTM A**4 ASTM A**5/**5M ASTM A**3/**3M
|
1/2"**2"
|
Applied to the production of transporting pipes with high temperature and low temperature and corrosion resistance in petroleum,chemical,and electronic industries,etc.
|
High pressure boiler pipe |
*0G *2Cr1MoVG *5CrMo |
GB********8 ASTM A*******9 |
1/2"**2" |
Applied to the production of transporting pipes with high-temperature and high-pressure resistance in electricity plant and nuclear plant ,etc. |
|
|
Packaging |
WoodenCases or wooden pallet or as per customers requirement |
Applications range |
Petroleum,chemical,power,gas,metallurgy,shipbuilding,construction,,etc |
Min Order Quantity |
Accroding to customer’s requirement |
Delivery Time |
2weeks/as per customer’s requirement |
Quality |
Very good, attestation of honour, choosed by customer,SGS |
Productivity |
*****0T Per Year |
Key to Sucess |
advanced technique and service |
Authentification |
ISO ***1:***0 |
Corporate Service |
DAILY AIRPORT & TOUR SERVICE/ Return Airport/Hotel/Airport transfer (Private saloon car)/ Hotel Shuttle |
Delivery Term |
FOB(*0deposite the balance before shipment) CIFor C&F(*0% deposite, the balance aginst with the copy of B/L) |
Country: | China |
Model No: | Alloy Steel Pipe |
FOB Price: | Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | - |
Packaging Detail: | as customers requirement |
Delivery Time: | 2weeks/as per customerÃ¢ï¿ |
Supplying Ability: | - |
Payment Type: | - |
Product Group : | - |