FOB Price
Get Latest Price|
- Minimum Order
Country:
South Korea
Model No:
-
FOB Price:
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
Product Group :
-
South Korea
Contact Person John
Seocho-gu, Seoul
Economic competitiveness in reinforced concrete work
1. Vertical & horizontal reinforcement at the rear side of existing
form and rectangular wood for fixing on the ground are not
required.
2. Reduction of work processes when building a form.
3. Reduction of work hours due to easy assembly, dismantlement
and handling. (3 to 5 days for one floor)
4. Construction crews can also build due to the simple process for
building this form.
5. Reduction of labor because this form is bigger and lighter than
other forms.
Improvement of concrete quality
A. Superior quality of concrete surface.
B. Accurate dimension of vertical and horizontal planes byintegrating form.
C. Reduction of concrete finishing due to reduction of form joints.
D. Improvement of initial strength of concrete by integrating thewhole area when pouring concrete.
Improvement of construction site environmentand safety management
A.Minimizing exposed concrete and concrete finishing.
B.Less possibility of safety accidents from falls of components as a complete system.
C.Economic Form by all of aluminum material
D.Substantial improvement of
Country: | South Korea |
Model No: | - |
FOB Price: | Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | - |
Packaging Detail: | - |
Delivery Time: | - |
Supplying Ability: | - |
Payment Type: | - |
Product Group : | - |