FOB Price
Get Latest Price700 ~ 900 USD / Ton ( Negotiable )
|5 Ton Minimum Order
Country:
China
Model No:
-
FOB Price:
700 ~ 900 USD / Ton ( Negotiable )Get Latest Price
Place of Origin:
China
Price for Minimum Order:
700 per Ton
Minimum Order Quantity:
5 Ton
Packaging Detail:
standard sea worthy packing
Delivery Time:
7 days
Supplying Ability:
2000 Ton per Month
Payment Type:
T/T, L/C
Product Group :
-
Contact Person Ms. Clare
East of Liaohe Road, Liaocheng, Shandong
X*2 line pipe manufacturing process:
1. Ring furnace heating control
Raw material placing angle: 2.8 ° C.Temperature control:
Preheating section: ******0 °C, preheating a section of
*******0 °C, heating a section of ********0 °C, heating two
sections of ********0 °C, heating three sections of ********0 °C,
soaking section of *******0 °C , the second section of the
soaking heat ********0 ° C (normal production control
according to the upper limit).
2. Punch control
When adjusting the hole type, the top front reduction rate is ≤5%,
the rolling speed is ≤0.7M/s, and the capillary temperature is
controlled at ********0°C.
3. Rolling mill control:
Rolling speed ≤0.*5M/S, high pressure water is opened in the
background, the head and tail of the waste pipe should be
sprayed,but not black, the temperature of the waste pipe is
controlled at ********0 °C.
4. Small cold bed: open high pressure water jacket and fan to
strengthen the steel pipe here.
5. Sizing machine control:
Use medium and thick wall pipe rolling speed, sizing inlet
temperature ≤ **0 ° C, outlet temperature ≤ **0
° C, high pressure water for cooling in the background
6. Thermal sampling control:
One of the open rolling heads is sampled, one for each of the head
and tail samples, and the wall thickness, outer diameter and length
of the steel pipe are carefully measured, and the rolling mill and
the sizing machine are adjusted according to the measurement
results, and all the geometrical dimensions of the steel pipe are
satisfied. Process requirements for continuous production. Each
batch must be sampled and checked in the class.
7. Cooling bed control
Inter-branched fabric: Select fast-forward mode. In this group
batch, the batch batch mode should not exceed **0 packs/batch after
cutting.
8. Straightening machine control
Carefully adjust the straightening machine to ensure that the
bending is acceptable. Be careful not to cause the steel pipe to
have concave and scratch defects.
What is seamless pipe?
Seamless pipe as the name suggests is a pipe without
a seam or a weld-joint in contrast to Seam or Welded
pipe. In a Seam or Welded pipe, the seam or the weld-joint is
the weaker part of the pipe limiting the strength of the pipe to
the strength of the weld-joint.
Country: | China |
Model No: | - |
FOB Price: | 700 ~ 900 / Ton ( Negotiable ) Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | 700 per Ton |
Minimum Order Quantity: | 5 Ton |
Packaging Detail: | standard sea worthy packing |
Delivery Time: | 7 days |
Supplying Ability: | 2000 Ton per Month |
Payment Type: | T/T, L/C |
Product Group : | - |