FOB Price
Get Latest Price|
1 Set Minimum Order
Country:
China
Model No:
-
FOB Price:
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
T/T, L/C, Western Union
Product Group :
-
Contact Person Ms. guo
No.76 Xinda Rd., Fenshui, Zhoutie Town, Yixing City, Jiangsu Province, China, Wuxi, Jiangsu
The key processes including material cutting, rolling, drilling are made by advanced CNC machining process to reduce the assembly stress and extend boiler working lifetime.
Fully intelligent operation, with automatic adjustment and protection of burning, water level, temperature and steam pressure. The smoke box door uses the hinge structure for easy inspection, inventory and cleaning.
The way to weld Smoke tube and tube sheet is to first expand to eliminate the gap between them, then adopt automatic argon arc welding to relief the stress and expand boiler service life.
Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint are test by radiographic inspection.
Fin tube uses ND steel or stainless-steel material to avoid corrosion in the low temperature .
Inspection stops are set up to guarantee the sequence of expanding and welding to avoid cracking of the tube sheet holes.
High quality aluminum silicate fiber is used with fire clay insulation, to control the boiler body temperature below *5℃ and reduce heat lost.
Condenser is added to recycle the waste heat of the exhausted smoke to increase feeding waters temperature and reduce flue gas emission temperature and increase the thermal efficiency over *8% and save operating cost.
Country: | China |
Model No: | - |
FOB Price: | Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | - |
Delivery Time: | - |
Supplying Ability: | - |
Payment Type: | T/T, L/C, Western Union |
Product Group : | - |