FOB Price
Get Latest Price|
10 Ton Minimum Order
Country:
China
Model No:
P295
FOB Price:
Place of Origin:
Wugang Henan
Price for Minimum Order:
-
Minimum Order Quantity:
10 Ton
Packaging Detail:
As Customers Requirement
Delivery Time:
25-40days after receive the order
Supplying Ability:
50 Ton per Day
Payment Type:
L/C, T/T
Product Group :
Contact Person yangyang
Zhoukou, Henan
Boiler and pressure vessel steel plate
Q**5R,Q**5R,Q**0R,*0g,*6Mng,*5CrMog
*2Cr1MoVg,*9Mng
*2Mng,*3MnNiCrMoNbg,*3MnNiMoR
*0R,*6MnR,*5MnVR
*5CrMoR,*3MnNiMoNbR
*5MnNbR,*5MnVNR
*6MnDR,*9MnNiDR
*5MnNiDR
*2Cr2Mo1R,*4Cr1MoR
*7MnCrMoVR
*7MnNiCrMoVDR
(S)A**5Gr.*0,*5,*0,
(S)A**6Gr.*0,*5,*0,
(S)A**7Gr*1,CL1,CL2
SB**0,SB**0,SB**0,SPV**5,
SPV**5,SPV**5,SPV**0,SPV**0,
SPV**0,SGV**0,SGV**0,SGV**0
SBV1A,SBV1B,SBV2,SBV3
SEV**5,SEV**5,SEV**5
H I,H II,*0CrMo**0,*5Mo3
*3CrMo*4,*9Mn6
BHW*5
*3MnNiMo*4
1Cr0.5Mo,2.*5Cr1Mo
1.*5Cr0.5Mo
(S)A**9M
(S)A**5Gr.*0,*5,*0
(S)A**4Gr.A,B,C
(S)A**7GL.1,CL.2
(S)A**2Gr.A,B,C
(S)A**2Gr.A,B,C,D
(S)A**7Gr.B,C
(S)A**8MGr.A,B,C
(S)A**3I,II
P**5GH,P**5GH,P**5GH
P**5GH,*6Mo3,*3CrMo**5
*0CrMo***0,*1CrMo***0
A*2,A*2
*0MnHR,*0HR,*6MnHR
**1G**0
Executive Standard: According to user requirements, can
be delivered the following criteria: national standards,
metallurgical industry standard, ASTM, ASME standards, Japanese
JIS, German DIN, British BS, European EN, the international ISO
standards and standards related to specific boards.
Delivery Status: According to the user's requirements, can be hot-rolled, normalizing, tempering, normalizing plus tempering, quenching and other different states to pay goods.
Quality levels: A, B, C, D, E and thickness direction of Z*5, Z*5, Z*5.
Inspection Standard: in accordance with China (JB***0, GB/T***0), United States (A**5, A**7, A**8), Japan (JISG***1, JISG***1), Germany (SEL**2), the United Kingdom (BS***6), France (NFS*****5), etc. are testing standard production testing.
Country: | China |
Model No: | P295 |
FOB Price: | Get Latest Price |
Place of Origin: | Wugang Henan |
Price for Minimum Order: | - |
Minimum Order Quantity: | 10 Ton |
Packaging Detail: | As Customers Requirement |
Delivery Time: | 25-40days after receive the order |
Supplying Ability: | 50 Ton per Day |
Payment Type: | L/C, T/T |
Product Group : | steel plate |