FOB Price
Get Latest Price|
1 Unit Minimum Order
Country:
China
Model No:
-
FOB Price:
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Unit
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
L/C, T/T
Product Group :
-
Contact Person Mr. Frank
shangjie, Zhengzhou, Henan
The bridge building crane for high speed railway uses full span method to construct bridge with span *0m,*4m and *2m, whole span girder weight **0t***0t, it is specially designed and made by ZZHZ .
Full span method means that girder carrier carries one whole span prefabricated box girder to the rear part of crane, then the bridge building crane lifts and puts it to the final position, and begins to install next span.
Main technical parameters
Product Model | HZQ**0 | HZQ**0 |
---|---|---|
Lifting Capacity (t) | **0 | **0 |
Max girder dimension(m) | *2.6×*3.4×3 | *2.6×8.4×3 |
Moving Speed (m/min) | **3 | **3 |
Trolley Moving Speed (m/min) | **3 | **3 |
Trolley lifting Speed (m/min) | **0.5 | **0.5 |
Trolley max lifting height(m) | 7 | 6.6 |
Girder transverse Trimming distance(mm) | ±**0 | ±**0 |
Girder Trimming speed(m/min) | **1 | **1 |
Tackle lifting weight(t) | *0 | *5 |
Min curve bridge radius(m) | ***0 | ***0 |
Power Required (kw) | **0 | **0 |
Out Dimensions (m) | *3.9×*3.5×*7.8 | *5.8×*1.*8×*1.8 |
Country: | China |
Model No: | - |
FOB Price: | Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Unit |
Packaging Detail: | - |
Delivery Time: | - |
Supplying Ability: | - |
Payment Type: | L/C, T/T |
Product Group : | - |