FOB Price
Get Latest Price|
50 Metric Ton Minimum Order
Country:
UK
Model No:
STEEL PIPE
FOB Price:
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
50 Metric Ton
Packaging Detail:
in BULK
Delivery Time:
20 days
Supplying Ability:
100000 Piece per Day
Payment Type:
L/C, T/T
Product Group :
Contact Person FORREST GUMP
39-41 CHASE SIDE, London, Other
Production |
Steel pipe / steel tube,STAINLESS STEEL PIPE/TUBE |
Standard |
API 5L, ASME, ASTM B*6, JIS, DIN, GB***2, GB***3, GB***0,etc. |
Out Diameter |
DN*0~DN***0,1/8"~**0",6mm~***0mm |
Wall Thickness |
SCH5~SCH**0,STD,XS,XXS,1mm~**0mm |
Material |
ASTM A**6 GRB/ A*3 GRB/ API 5L X*2,X*2,X*0,X*5,X*0GRB/ API 5 CT/ Q**5/ ST*2/ST*7/ ST*2.Q**5/Q**5/Q**5/A**9, **1, **1, **4, **4L, **6, **6L,**7,**7L ,**0S etc. |
Length |
*2m,*1.8m,6m,5.8m,or as customers required |
Surface treatment |
Black painting, black varnish, transparent oil, hot galvanized, 3PE,epoxy coating,BE,PE.etc. |
Technique |
Seamless & welded |
Usage |
1. Low and middle pressure fluid transportation pipeline 2. Casing Tube 3. Boiler Pipe 4. Petroleunm and natural gas industry 5. Chemistry industry 6. Electric industry |
Package |
1. Bundle packing. 2. Bevelled end or plain end or warnished as per buyer's required. 3. Marking: as per customer's requests. 4. Painting varnish coating on the pipe. 5. Plastic caps at ends. |
Supply |
1. seamless steel pipe 2. ERW steel pipe 3. steel casing 4. tubing 5. hot-rolled steel pipe 6. spiral steel pipe 7. hot-galvanized steel pipe |
Min Order Quantity |
According to customer's requirement |
Payment terms |
L/C, T/T, etc. |
Country: | UK |
Model No: | STEEL PIPE |
FOB Price: | Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 50 Metric Ton |
Packaging Detail: | in BULK |
Delivery Time: | 20 days |
Supplying Ability: | 100000 Piece per Day |
Payment Type: | L/C, T/T |
Product Group : | STEEL |