FOB Price
Get Latest Price|
- Minimum Order
Country:
China
Model No:
DAC-EH
FOB Price:
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
3 days
Supplying Ability:
-
Payment Type:
-
Product Group :
-
Contact Person Mr. Ryan
Jianshan Industrial Park, HAINING, ZHEJIANG
Features: 1) Designed by the standard of getting heat in winter 2) Dong'ao heat-wasting restraining technology 3) Acceleration of hot water circulation TG technology 4) High temperature vacuum heat collecting tubes with new triangle elements 5) The thickened heat preservation layer of high density 6) Large-angle specially adapted to high and cold areas 7) Stronger wind, snow, and hailstone resistant ability 8) More coordinate with the architectural environment 9) The hot water system fitting for families and work units in mass storage and large trend
Country: | China |
Model No: | DAC-EH |
FOB Price: | Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | - |
Packaging Detail: | - |
Delivery Time: | 3 days |
Supplying Ability: | - |
Payment Type: | - |
Product Group : | - |