FOB Price
Get Latest Price625 ~ 975 USD / Metric Ton ( Negotiable )
|5 Metric Ton Minimum Order
Country:
China
Model No:
SJTD-carbon-001
FOB Price:
625 ~ 975 USD / Metric Ton ( Negotiable )Get Latest Price
Place of Origin:
Tianjin,China
Price for Minimum Order:
625 per Metric Ton
Minimum Order Quantity:
5 Metric Ton
Packaging Detail:
standard export packing
Delivery Time:
10-25days
Supplying Ability:
3000 Metric Ton per Month
Payment Type:
T/T, L/C
Product Group :
Contact Person Mr. Andrew
Shunyi Road, Tianjin, Tianjin
DIN ***6 ST*7/ST*5.8 structural seamless tube
specification/size
>>>standard:BS,ASTM ,
ASME , EN , DIN ,GB, JIS ect
>>>material:STB*5,STB*3,STB*0,STB*8,A**6A,ST*5.8,ST*7,DIN***6
>>>size:OD:1/2''****2'',*1.****0mm,WT:****0mm
>>>length:6m to *2m or customized can be
accepted
>>>st*7 chemical composition:
C——(0.*7~0.*4)%
Si——(0.*7~0.*7)%
S<=0.*4%
P<=0.*5%
Cr<=0.*5
Ni<=0.*5
Cu<=0.*5
>>>Yield pointnot less **5Mpa
tensile strength not less **0Mpa
elongation:*5%
reduction:5%
hardness(HBS)not more **6HBS
>>>application:Petroleum, power,gas metallurgy,
papermaking, chemical, medical equipment, aviation, boiler
heat, exchanger, shipbuilding, construction, etc
>>>TPCO products
prime main
advantages
>>> products be produced
in china,CO will be provide
>>> FROM A,FROM E, if need, we can apply for
you
>>> TPCO products, top quality, not have
worried
>>> best price in Tianjin,China
>>> MTC of factories will be provide
>>> international approvals,SGS or other test will be
accepted
>>> prompt delivery
>>> small orders accepted
Business trade term and Main Export
Markets:
>>> loading
port:xingang,china
>>> delivery time:*0days no more than **0Tons, others
need discussed
>>> payment term:T/T or L/C is common, others
discussed
>>> packing:standard export packing
>>> main export markets:Eastern Europe,North
America,Mid East/Africa,Central/South America,Asia,Western
Europe,Australasia
Country: | China |
Model No: | SJTD-carbon-001 |
FOB Price: | 625 ~ 975 / Metric Ton ( Negotiable ) Get Latest Price |
Place of Origin: | Tianjin,China |
Price for Minimum Order: | 625 per Metric Ton |
Minimum Order Quantity: | 5 Metric Ton |
Packaging Detail: | standard export packing |
Delivery Time: | 10-25days |
Supplying Ability: | 3000 Metric Ton per Month |
Payment Type: | T/T, L/C |
Product Group : | carbon steel pipe |