FOB Price
Get Latest Price900 ~ 1000 USD / Metric Ton
|20 Metric Ton Minimum Order
Country:
China
Model No:
ECY410G
FOB Price:
900 ~ 1000 USD / Metric Ton Get Latest Price
Place of Origin:
-
Price for Minimum Order:
900 per Metric Ton
Minimum Order Quantity:
20 Metric Ton
Packaging Detail:
48rolls per pallet or 64rolls per pallet
Delivery Time:
10days after receievd the advance payment
Supplying Ability:
1000 Metric Ton per Month
Payment Type:
L/C, T/T
Product Group :
Contact Person Mr. Ray
17# Gaoshengqiao Donglu, Wuhou Hi-Tech Industrial Development Zone, Chengdu, China, Chengdu, Sichuan
E-Glass Spray up Roving
Assembled E-glass roving for spray up molding, it is coated with a silane based sizing, mainly compatible with reinforced unsaturated Polyester, Vinyl ester resin and Polyurethane resin and so on. It is mostly used to produce FRP boat hulls, safe board, sanitary apparatus and swimming pools etc.
Type of glass |
E |
Filament diameter (um) |
*2 |
Linear Density (tex) |
***0,***0 |
Product Characteristics:
a. Good choppability and stiffness
b. Good diversion and low static
c. Excellent lay down property
d. Excellent mold flowability & fast wet out
Technical Parameters:
Linear Density |
Filament diameter |
Moisture content |
LOI |
±5% |
*2μm ±1um |
≤0.1% |
1.*0±0.*5% |
Packaging:
E-Glass Spray up (Chopped) Roving ***0 tex can be packed on pallet in both small & big size
Package height(mm) |
**0 |
Package inside diameter (mm) |
*0 |
Package outside diameter(mm) |
**0 |
Package weight(kg) |
*7 |
Number of layers |
3 |
4 |
Number of rolls per layer |
*6 |
|
Number of rolls per pallet |
*8 |
*4 |
Net weight per pallet (kg) |
**4 |
***2 |
Pallet length (mm) |
***0 |
***0 |
Pallet width (mm) |
***0 |
***0 |
Pallet height (mm) |
**5 |
***0 |
Storage:
Application:
Shipment:
Country: | China |
Model No: | ECY410G |
FOB Price: | 900 ~ 1000 / Metric Ton Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 900 per Metric Ton |
Minimum Order Quantity: | 20 Metric Ton |
Packaging Detail: | 48rolls per pallet or 64rolls per pallet |
Delivery Time: | 10days after receievd the advance payment |
Supplying Ability: | 1000 Metric Ton per Month |
Payment Type: | L/C, T/T |
Product Group : | E-glass Fiberglass Mat |