FOB Price
Get Latest Price|
1 Unit Minimum Order
Country:
China
Model No:
GI
FOB Price:
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Unit
Packaging Detail:
150pcs of g24 led bulb light in one box
Delivery Time:
3 - 10 days after payment or deposit
Supplying Ability:
40000 Unit per Month
Payment Type:
Other, PayPal, Western Union, T/T
Product Group :
Contact Person Mr. Justin
Room 1302,14th Building,9th Lane,Shang sha east estate, Futian District, Shenzhen, Guangdong
PLC LED G24 light
ALL models are UL/cUL listed and CE ROHS crtification.
1.Specification chart of G24 LED bulb:
120deg Horizontal mount LED PL lamp
360deg
Vertical mount LED PL lamps
2.Advantages of G24 LED bulb:
1).Both Utility model patent and renewed design patent
2).Top quality drivers:PFC>0.91, Harmonic wave< 9%, ripple wave< 9%
3).Higher lumen compared to similar models of others
4).Driver box:drivers are seperated from heat sink, remarkably increasing lifespan
5).View angle:120 °&360°
6).Wide base range options:G23/GX23(2 pin), G24D(2 pin), G24Q/GX24Q(4 pin)
7).High end Osram & Edison chips with LM80 report
8).UL/cUL/CE ROHS listed
3.Features of G24 LED bulb:
1).Operating temperature range:from-25 to 45 Celsius deg
2).Reduce energy costs up to 90% compared to traditional
lamps,reduce maintenance costs up to 90%, almost free of
maintenance
3).Heat and Shock Resistant ,no shadow and shatter-resistant
4).Lightweight with small design, ideal for indoor use, very easy
for replacement
5).Does not produce UV rays that harm people’s eyes.
6).Directional light means no light pollution,dark sky
compliance.
7).Free of charges on shipping back and forward of defective
products
4. Comparison of G24 LED bulbwith traditional
CFL light:
5.Application of G24 LED bulb:
Fits in different various cans or high commercial building.
6.Packing of our G24 LED bulb:
7.Advantages of Green Inova Tech.
1).ISO9001:2008 certificates, ETL/CETL, DLC, CE/ ROHS
certificates.
2).Professional R & D center, quickly after-service team,
long warranty period.
3).Short production period, make sure delivery in time, which is
usually 2 to 15 days after deposit.
4).Plenty experience on the installation of street lighting for
the main street of the city.
Country: | China |
Model No: | GI |
FOB Price: | Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Unit |
Packaging Detail: | 150pcs of g24 led bulb light in one box |
Delivery Time: | 3 - 10 days after payment or deposit |
Supplying Ability: | 40000 Unit per Month |
Payment Type: | Other, PayPal, Western Union, T/T |
Product Group : | LED PL lamps |