FOB Price
Get Latest Price0.4 ~ 2.5 USD / Piece
|5000 Piece Minimum Order
Country:
China
Model No:
-
FOB Price:
0.4 ~ 2.5 USD / Piece Get Latest Price
Place of Origin:
-
Price for Minimum Order:
0.4 per Piece
Minimum Order Quantity:
5000 Piece
Packaging Detail:
Naked package, 10 pcs to a bundle, or according to your requirement.
Delivery Time:
Within 7-15 days upon received 30% deposited
Supplying Ability:
24 Ton per Week
Payment Type:
T/T
Product Group :
Contact Person Ms. FISH
lezhujiao stree, Shenzhen, Guangdong
Metal Building Decoration Metal Stud And Track For Drywall Partition
Features
Material:
Galvanised steel
Zinc Coated Level:
*0~**0 g/m2 (depends on the customer's request)
Thickness:
0.*5~1.*0mm
Length:
***0mm, ***0mm, ***0mm, ***0mm, ***0mm, ***0mm
Advantage
1. galvanized steel profile raw material is high quality hot dipped zinc galvanized steel strip, absolute damp proof , heat insulation and high durability , high rust resistance.
2. The specification can follow up customer requirments.
3. Advanced equipment can make sure exactly size, high quality products.
Application
1.Supermarket, marketplace
2.Underground, air port, bus station
3.Building lobby,metro station
4.Hotel, restaurant,railway station
5.School, office, meeting room ,hospital
6.commercial building
Tips
If you have any special requirement, please advise us the length, width, height and the thickness, also the quantity. Thanks
Metal Partition System
Picture | Product |
Specification width*height*length(mm) |
Packing (pcs/carton) |
Matching (pcs/sqm) |
Stud (CW) | *0**0****0/***0 | *0 | 2 | |
*5 **0****0 /***0 | ||||
**0 **0****0 /***0 | ||||
**0 **0****0 /***0 | ||||
TracK (UW) | *0 **0****0 /***0 | *0 | 1 | |
*5 **0****0 /***0 | ||||
**0 **0****0 /***0 | ||||
**0 **0****0 /***0 |
Country: | China |
Model No: | - |
FOB Price: | 0.4 ~ 2.5 / Piece Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 0.4 per Piece |
Minimum Order Quantity: | 5000 Piece |
Packaging Detail: | Naked package, 10 pcs to a bundle, or according to your requirement. |
Delivery Time: | Within 7-15 days upon received 30% deposited |
Supplying Ability: | 24 Ton per Week |
Payment Type: | T/T |
Product Group : | Drywall partition |