Product Description
1# Gas Turbine
Firstly, technical specification of 1# gas turbine:
Manufacturer: China Nanjing Turbine and electrical machinery
Co.
Model: PG***1B
Under the condition of ISO(Air Temperature *5℃, Atmospheric
Pressure 1.**3×**5Pa), under basic load, technical
performance indicators of the units are as follows:***0T/M GT
Rotational speed, Intake pressure loss **6Pa, Exhaust
pressure loss **2Pa.
When units use GEI*****7 fuel, units parameters in single
cycle operation are as follows:
Operation Mode Basic Load
Fuel
Light Oil Heavy Oil
Output Power
kW
****5
****0
Heat Rate
KJ/KW.h
****6 ****9
Heat Consumption
**6KJ/h
**9.8 **5.8
Turbine Inlet Temperature ℃
***4
***8
Exhaust
Temperature
℃
**9 **9
Air Flow
**3Kg/h
**1 **1
Oil Consuming Rate g/KW.h
**6
**9
* Calculate light oil low calorific value based on
****0KJ/Kg
Secondly, genenrator technical specifications of 1# GT
are as follows:
Manufacturer Nanjing Turbine and Electric Machinery Co.
Model QFR****2
Product Standard QJ/***1 NQ*****9
Power
*6MW
Voltage
*0.5KV
Electric Current ***4A
Power Factor 0.8
Frequency
*0HZ
Rotational Speed ***0 rpm
Excitation voltage **0V
Excitation Current **9A
Stator insulation B
Rotor insulation F(Examination on B
Grade)
Thirdly, GT Operation
1#GT is in operation from Octo in ***6, until now start it 1,**0
times, among them ignition it 1,**3times. In total, it operates
*2,**6 hours, among them, operation burning fuel(light oil) is
*2,**2 hours, gas fuel(gas) **4 hours.
Fourthly, Introduction to Inspection and
Repair
1. in April in ***9, after operating 3,**0 hours, GT goes into
combustion inspection. We replace the flame tubes 1#, 3# and
*0#.
2. in March in ***3, operating 6,**2 hours, GT goes into half-way
repair. We replace flame tube 9# and positive flame connecting
tubes **2 and **3; *0 transition portions are sent to Shenyang
Liming to repair, replacing inside and outside floating seal and
spraying coating again.
3. in March in ***4, after operating 8,**0 hours, generator goes
into large-scale repair, replacing Bearing 4#, repairing Bearing
3#; The generator guard ring shifts, generator sent to Nanjing
Turbine and Electric Machinery Co. to reassemble.
4. in March of ***5, after operating *1,**2 hours, GT goes into
overhauling.
Overhaul appendix gear box: replace Bearing 2# and Tile 3#,
Bearing 3A# and Tile 5#, Bearing 3B# and Tile #, Bearing 4# and 4
tiles inside and outside.
Overhaul generator: send generator rotor back to Nanjing company
to replace its guard ring.
Overhaul GT body: replace the first level sprayer, *0 transition
portions and tiles of Bearings 1# and 2#.
2# Gas Turbine
Firstly, Technical specifications:
Manufacturer: China Nanjing Turbine and Electric Machinery
Co.
Model: PG***1B
Under the condition of ISO(Air temperature *5℃, Atmospheric
Pressure 1.**3×**5Pa, Relative Humidity *0% ), under the
basic load, units technical specifications are as follows:
GT Rotational speed 5,**3T/M, intake pressure loss **6Pa, exhaust
pressure loss **2Pa. When units use liquid fuel GEI*****7 and gas
fuel GEI—****0E, units parameters in single cycle operation are
as follows:
Operation Model Basic Load
Fuel Light
Oil Gas
Output Power kW
****0 ****0
Heat Rate
KJ/KW.h
****4 ****0
Heat Consumption
**6KJ/h **9
**3
Turbine inlet temperature
℃ ***4
***4
Exhaust temperature
℃ **2
**2
Air Flow
**3Kg/h **9
**9
Secondly, Generator technical specifications
Manufacturer Nanjing Turbine and Electric Machinery Co.
Model
QFR****2
Phase Number 3
Pole Number 2
Power
*8MW
Voltage
*0.5KV
Electric Current ***1.8A
Power Factor 0.8
Frequency
*0HZ
Rotational Speed ***0 rpm
Excitation Voltage **2V
Excitation Current **0A
Insulation Class F
Stator Connection Y
Thirdly, GT Operation
3#GT starts operation from July in
***3, until now start **4 times, among them ignition **7 times.
In total, it operates for 6,**1 hours, among which operation
burning liquid fuel (light oil) for 5,**2 hours, burning gas fuel
(gas) for **9 hours. At present, the operation of 3# GT is
normal.
Fourthly, the Introduction to Inspection and
Repair
1. in Nov of ***4, after operating 4,**4 hours, GT goes into
combustion inspection(not to dismantle transition), replacing
flame connecting tubes in 7#*8#(including 7#) and 3#*2#(including
2#), and flame tube like *0#.
2. in April of ***4, after operting 5,**0 hours, Gt goes into
combustion inspection. We replace flame connecting tubes in
7#*8#(including 7#) and 9#*8#(including 9#). We sent 5 transition
portions to Liming to repair: among them, the attrition of left
side tail frame nearby negative camber is so severe as to be sent
to repair.
Country: |
China |
Model No: |
-
|
FOB Price: |
(Negotiable)
Get Latest Price
|
Place of Origin: |
- |
Price for Minimum Order: |
- |
Minimum Order Quantity: |
- |
Packaging Detail: |
- |
Delivery Time: |
- |
Supplying Ability: |
- |
Payment Type: |
- |
Product Group : |
- |