FOB Price
Get Latest Price111 ~ 999 USD / Set ( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
Africa Gold Ore Plant, Gold Mining Plant, Gold Wash Plant, Barrack Gol
FOB Price:
111 ~ 999 USD / Set ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
111 per Set
Minimum Order Quantity:
1 Set
Packaging Detail:
Bare machine in container, small parts in wood box
Delivery Time:
30 days
Supplying Ability:
30 Set per Month
Payment Type:
L/C, T/T
Product Group :
-
Contact Person Ms. Helen
No.6 Dongzhen Road,Xinxiang City,Henan Province, Xinxiang, Henan
Four Steps Of gold ore
plant(Gold ore,Iron ore)
Step1:Crushing*- Put the
ingredients broken
1)process introduction: Due to the volume of ore
produced is too large , so it is necessary to the mined ore
crushing. In this process , send the ore into the crushing device
to crushed . In general, The System requirements of the ore
particle size for general *2mm*******8mm.
2).Main
Equipment: Jaw crusher,impact crusher,hammer
crusher,cone crusher etc
Step2:Grinding*-The
processing of raw materials carefully
1)
Process introduction: In this process, we must
first make clear the requirements for each ore solution particle
standards, Based with the aid of various equipment, put all sorts
of ore grinding to separation units required unit solution
size.
2).Main
Equipment:Feeder,Ball Mill,Classifier, Overflow ball
mill,etc.
Step3: Sorting *-Select fine ore
powder
1).Process introduction:In the production
process,not all the ore powder are in line with the standard . we
need to filter the ore powder . In this process We use professional
equipment to elect qualified concentrate powder from ore ,
eliminated does not meet the criteria for ore.
2).Main
Equipment:Mixing machine ,Flotate separator,magnetic
separatoretc.
step4:Dehydration *-Take off water
in the ore
1).Process introduction:Due to various
constraints, after the front of several processes , there are
always some residual moisture in the ore powder, then we need to
pick out concentrate dehydration, to meet the requirements of
transportation and smelting.
2.)Main
Equipment:Vacuum filter,Box pressure filter,Folding belt
filter,Ceramic filter,Vacuum pump, Driving
thickener,etc.
We can help you to sort
out effective solutions to practical problems for the gold
beneficiation line. If you have problems ,please tell us.
That's the best choice!!
Country: | China |
Model No: | Africa Gold Ore Plant, Gold Mining Plant, Gold Wash Plant, Barrack Gol |
FOB Price: | 111 ~ 999 / Set ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 111 per Set |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | Bare machine in container, small parts in wood box |
Delivery Time: | 30 days |
Supplying Ability: | 30 Set per Month |
Payment Type: | L/C, T/T |
Product Group : | - |