FOB Price
Get Latest Price3 ~ 15 USD / Piece
|20 Piece Minimum Order
Country:
China
Model No:
-
FOB Price:
3 ~ 15 USD / Piece Get Latest Price
Place of Origin:
Shandong,China
Price for Minimum Order:
3 per Piece
Minimum Order Quantity:
20 Piece
Packaging Detail:
Vacuum packing and carton outside. 8-10pcs/pack or according to customers' requirements
Delivery Time:
by air/sea, in 15 days after receiving the payment
Supplying Ability:
20000 Piece per Month
Payment Type:
L/C, T/T
Product Group :
Contact Person Ms. Selina
Xilongjiao Village, Kunlun Town, Zichuan Dist, Zibo, Shandong
1)Size of the evaporation boat (in mm):
**0**6*9 |
**0**0**0 |
**5**0**0 |
**0**4**0 |
**0**6**0 |
**0**0**0 |
**0**0*1 |
**0**5**0 |
**0**5**0 |
(2)
Physical performances:
Cold
Resistivity(*0°C) |
*******0μΩ.cm |
Evaporation
speed |
0.**0.5g/min.cm2Â |
Working
temperature |
Below ***0°C |
Thermal
conductivity
(*0°C/***0°C) |
>**0/*0W/m.k |
Coefficient
of thermal expansion
(***0°C) |
(**6)X***6KÂ |
Flexural
strength(*0°C) |
>**0MPa |
Specification |
According to customers’ size |
Packaging |
Vacuum package |
 (3)
Tehnology standard:
1.Length:L±0.5
2.Width:B*0.1
3.Thickness:H±0.*8
4.Bending
strength:≤0.5mm
5.Undersurface
roughness :≤0.1mm
6.Two
sides nonparallelisn:≤0.2mm
 (4)Using
conditions:
1.working
current:******0A
2.working
voltage:***5V
3.
working temperature:***0 - ***0°C
4.evaporation
rate:0.**0.5g/ minute /cm^2
5.
service life :****5hours
 (5)Properties
of products:
1.Good
thermal performance and good stability.
2.Good
insulativity, Abrasion-resistance
3.Good
processing performance, Precision can reach
0.*1mm
4.Good
chemistry stability,can not reaction with Metal And
acid.
5.Pierce
Infrared and microwave,absorption neutron
6.non-poisonous
 (6)Application:
As
melting aluminum and zinc sulfide, using in vacuum evaporation
technology.Â
In order
to play best capacity of evaporation boat, please operate as
following:
1. Keep
two rows of fixture alignment and keep the surface
smooth.
2. When
first heating for the new boat, please put an aluminium yarn in
the central
groove in order to judge the boat's temperature.
3. The
connection point of Aluminium yarn should be located in 1/3 to
1/2 place of
boat.
4. For
the first heating for new boat, please don't heat quickly, in
order to avoid to
affecting air bleeding.
5. For
the first time,the speed of sending aluminum should at the rate
of *5%
normal speed and increase gradually,And turn down the power in
order to reach to
max area of aluminum liquid.
6. For
the first boat, first heating for *5 minutes will be best. And
send aluminum to
evaporate plating follow the above methods.
7. When
each coil finished evaporating, please stop sending aluminium
first. And
stop the power ****0 seconds later. Two minutes after stop
power and the boat's
color turn to dark red, than stop close vacuum.
Country: | China |
Model No: | - |
FOB Price: | 3 ~ 15 / Piece Get Latest Price |
Place of Origin: | Shandong,China |
Price for Minimum Order: | 3 per Piece |
Minimum Order Quantity: | 20 Piece |
Packaging Detail: | Vacuum packing and carton outside. 8-10pcs/pack or according to customers' requirements |
Delivery Time: | by air/sea, in 15 days after receiving the payment |
Supplying Ability: | 20000 Piece per Month |
Payment Type: | L/C, T/T |
Product Group : | Boron Nitride |