FOB Price
Get Latest Price( Negotiable )
|25 Ton Minimum Order
Country:
China
Model No:
-
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
25 Ton
Packaging Detail:
AS CUSTOMER REQUIRED
Delivery Time:
20-30 DAYS AFTER RECEIVING THE DEPOSIT OR L/C
Supplying Ability:
5000 Ton per Month
Payment Type:
D/P, L/C, T/T
Product Group :
Contact Person Doria
No.46, East Renmin Rd., Yuhua Dist., Changsha, Hunan
Hot Dipped Galvanized Ringlock Scaffold System from ADTO Group
ADTO Ring-Lock Scaffolding System consists of hot dipped galvanized steel pie and modular components that are assembled together using integral wedge connectors. ADTO ring-Lock system is a modular scaffold system which can provide major saving in labor cost while meeting the demands for safety, ease of handling and reductions in maintenance.
1). RINGLOCK SCAFFORD Quick Details
a. Diameter: *8.3mm
b.Thickness of the tube: 3.2MM
c. Material: Q**5,Q**5,Q**5B
ect. as your requirement
d. surface: hot dipped galvanized
e. Packaging Detail: Steel Pallet, packed in bundle,
suitable sea transport.
f. Delivery Detail: ****0 days after receive the L/C or
deposit
g. contents: verticals, Ledger,diagonal Brace, Metal Plank, Ladder, Base jack, Rosette, base collar,board bracket
2). RINGLOCK SCAFFORD Specifications
RINGLOCK SCAFFORD STANDARD WITH SPIGOT
M*8(*8.3mm x 3.2mm, Q**5B, Hot Dipped Galvanized)
description | size(mm) | sizes(in) | weight(kg) | weight(lbs) |
M*8 Verticals with OD *8.3mm(1.9in) and 3.2mm(0.*6in) thickness | **0 | *9.*0 | 2.*6 | 6.*7 |
***0 | *9.*0 | 5.*8 | *1.*0 | |
***0 | *8.*0 | 7.*1 | *6.*4 | |
***0 | *8.*0 | *0.*3 | *2.*7 | |
***0 | *7.*0 | *2.*5 | *7.*9 | |
***0 | **7.*0 | *4.*7 | *2.*1 | |
***0 | **6.*0 | *9.*2 | *3.*8 |
description | size(mm) | sizes(in) | weight(kg) | weight(lbs) |
M*8 Ledger with OD *8.3mm(1.9in) and 3.0mm(0.*2in) thickness | ***0 | *9.*0 | 4.*2 |
Country: | China |
Model No: | - |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 25 Ton |
Packaging Detail: | AS CUSTOMER REQUIRED |
Delivery Time: | 20-30 DAYS AFTER RECEIVING THE DEPOSIT OR L/C |
Supplying Ability: | 5000 Ton per Month |
Payment Type: | D/P, L/C, T/T |
Product Group : | Ringlock saffolding system |