FOB Price
Get Latest Price900 ~ 2000 USD / Ton ( Negotiable )
|20 Ton Minimum Order
Country:
South Korea
Model No:
-
FOB Price:
900 ~ 2000 USD / Ton ( Negotiable )Get Latest Price
Place of Origin:
South Korea
Price for Minimum Order:
900 per Ton
Minimum Order Quantity:
20 Ton
Packaging Detail:
Coil, Drum Reeling, Steel Bobbin Reeling
Delivery Time:
Shall be discussed
Supplying Ability:
50000 Ton per Year
Payment Type:
T/T, L/C
Product Group :
-
South Korea
Contact Person Mr. Junghoon
53, 48th gil, Gayadae-ro, Sasang-gu, Busan
This is the most basic product .
We obtained Standards rate of zinc coating over
**0g/m2 such as SWMGS*6~7.
We can manufacture maximum 1,**0kg if consumer ordered according
to many kinds of reeling.
- Service : Galvanized steel wire for an armored electric wire
and so on.
- Standards: BS **3/***2, JIS G ***7, ASTM A **1
- Packing : Coil, Drum reeling, Steel bobbin reeling and so
on.
- Possible manufacturing Diameter : 0.*0 ~ 8.*0mm
- Possible manufacturing weight : *5kg ~ 1.**0kg
Your inquiry will be highly treated.
Country: | South Korea |
Model No: | - |
FOB Price: | 900 ~ 2000 / Ton ( Negotiable ) Get Latest Price |
Place of Origin: | South Korea |
Price for Minimum Order: | 900 per Ton |
Minimum Order Quantity: | 20 Ton |
Packaging Detail: | Coil, Drum Reeling, Steel Bobbin Reeling |
Delivery Time: | Shall be discussed |
Supplying Ability: | 50000 Ton per Year |
Payment Type: | T/T, L/C |
Product Group : | - |