Product Description
Hydraulic Anchor
Usage: It is used as a down-hole string tool
anchor, to prevent axial movement of the down-hole
tools, for oil layer hydraulic fracture, increasing water in
a water well, hydraulic jetting sand, cutting or jetting sand
perforation, etc.
Structure features: Inject high pressure
liquid through tubing, then the anchor finger compresses
the spring under hydraulic pressure toward casing
surface and clamps on it, to overcome axial push during
operation, and fix down-hole string tools.
Full-bore Compensating Pipe
Usage: Full-bore compensating pipe is a crucial
accessory of down-hole string tools. Used
as a compensating system for string tools length
changes cause of internal & external pressure or temperature
changes, it could prevent danger caused of axial power
changing.
Used with mechanical or hydraulic packer, widely used in
fracturing, acidification or other increasing production
operations, for water injection and gas injection as well.
Structure features: Full bore compensating pipe
is always connected on the top of the packer. When down-hole
production (operation) string tools pull back because of
temperature or pressure changing, the string end anchored by
the packer or hydraulic anchor, the tubing string power exerted
on the compensating pipe. When the power is higher than cutting
power, the shear pin is cut, the expanding mandrel moves
longer than the seal sleeve, which could compensate the
string tools and achieve the compensating function.
Mechanical Releasing Tool
Structure features: When the packer or the
bridge plug is run to determined section and setting well, pull
up the tubing string to cut the shear pin, disconnecting the
upper tubing string of the packer or the bridge plug,
to achieve releasing.
Differential Pressure Releasing Tool
Structure features: When the packer or the
bridge plug is run to the determined section and setting well,
pressurize the tubing string, forcing the cylinder
to move downward as to cut the shear pin, removing
the control of head finger below top coupling. Pull up the
tubing string to disconnect the top of the tool, to achieve
releasing.
Country: |
China |
Model No: |
-
|
FOB Price: |
( Negotiable ) (Negotiable)
Get Latest Price
|
Place of Origin: |
- |
Price for Minimum Order: |
- |
Minimum Order Quantity: |
1 Set |
Packaging Detail: |
- |
Delivery Time: |
30 days |
Supplying Ability: |
100 Set per Month |
Payment Type: |
T/T, L/C, Other |
Product Group : |
Well testing and completion tools
|