FOB Price
Get Latest Price800 ~ 1300 USD / Ton
|100 Ton Minimum Order
Country:
China
Model No:
-
FOB Price:
800 ~ 1300 USD / Ton Get Latest Price
Place of Origin:
-
Price for Minimum Order:
800 per Ton
Minimum Order Quantity:
100 Ton
Packaging Detail:
bundled for dn80~250mm, bulk for dn300~1200mm
Delivery Time:
within 60 days after receiving deposit
Supplying Ability:
-
Payment Type:
-
Product Group :
-
Contact Person ruby
Nanning, Guangxi
Production Process Flow of Ductile
Cast Iron Pipe
Molten iron->molten iron purification -> heating and
sphereodization->spheroidization->centrifugal
casting->Annealing->zinc spraying->rounding and
grinding->hydraulic testing->cement
lining->cultivating->bitumen coating->packing
1) The standard of pipe: EN**5,
K9
2) Effective length: 6m
3) Inner cement line: Portland cement line as per ISO***9
4) Zinc coating: at least **0g/m2 as per ISO***9
5) Bitumen painting: at least *0um as per ISO***9
6) With **0% quantity of SBR ring, or EPDM ring as per ISO***3
7) DN*0mm****0mm
8) High strength, lighter than grey iron, good corrosion resistance, no furring, small flow resistance, easy fixing, long life tome about **0 years
9) Composition:
Chemical composition |
|||
Chemical composition |
Ductile Cast Iron Pipe (%) |
Grey iron pipe (%) |
Steel pipe (%) |
C |
3.**4.0 |
3.**3.8 |
0.**0.2 |
Si |
1.**2.6 |
1.**2.2 |
0.***0.4 |
Mn |
0.***0.*5 |
0.**0.6 |
0.**0.6 |
P |
≤0.*6 |
≤0.3 |
0.***0.*3 |
S |
≤0.*2 |
≤0.1 |
0.***0.*3 |
Mg |
0.***0.*6 |
|
|
*0) Feature:
Mechanical properties |
|||
|
Ductile Cast Iron Pipe |
Grey Iron Pipe |
Steel Pipe |
Tensile Strength(Mpa) |
≥**0 |
******0 |
≥**0 |
Yield Strength(Mpa) |
≥**0 |
No Confirmation |
No Confirmation |
Bending Strength(Mpa) |
≥**0 |
******0 |
≥**0 |
Elongation (%) |
≥*0 |
Neglected |
≥*8 |
Brinell Hardness(HBS) |
≤**0 |
≤**0 |
About **0 |
*1) T type mechanical joint
*2) Packing: in bulk or container
Country: | China |
Model No: | - |
FOB Price: | 800 ~ 1300 / Ton Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 800 per Ton |
Minimum Order Quantity: | 100 Ton |
Packaging Detail: | bundled for dn80~250mm, bulk for dn300~1200mm |
Delivery Time: | within 60 days after receiving deposit |
Supplying Ability: | - |
Payment Type: | - |
Product Group : | - |