FOB Price
Get Latest Price11999 ~ 17999 USD / Set ( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
BQ20
FOB Price:
11999 ~ 17999 USD / Set ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
11999 per Set
Minimum Order Quantity:
1 Set
Packaging Detail:
Standard export packing for the mortar spraying pump
Delivery Time:
Usually in 10 working days for the mortar spraying
Supplying Ability:
5000 Set per Month
Payment Type:
T/T
Product Group :
China
Contact Person Ada
Xushui Town, Zhongyuan District, Zhengzhou, Zhengzhou, Henan
small mortar spraying
pump
Introduction of our mortar spraying pump :
LEC mortar pump is absorbs the domestic and foreign
advanced technology to develop a new type of multifunctional
construction machinery. It is widely used for building mortar
conveying and geotechnical engineering grouting large
spray.Â
Advantage of
our mortar spraying pump :
Hydraulic
drive, piston regulated, with mature technology and
stability
Assembled
with pressure compensator on the opening, continuously regulate the
output speed, with small pulsation.
Low request
of labor intensity with operator
High delivery
pressure, heavy flow and high efficiency.
 Technical parameters of mortar spraying pump :
Â
Model No./Mortar pump | BQ*0 |
Max. theoretical concrete output(m³/h) | Low pressure *0/high pressure *1 |
Max. theoretical concrete pumping pressure(Mpa) | Low pressure 4.2 /high pressure 8 |
Theoretical vertical conveying height(m) | **0 |
Theoretical level transmission distance(m) | **0 |
Max. Aggregate particles(mm) | 5 |
Hopper volume(m³) | 0.*2 |
Filling height(mm) | **0 |
Dynamic brand | Electric motor |
Dynamic model | *-phase asynchronous motor |
Rated power(kw) | *0 |
Hydraulic oil tank volume(L) | **0 |
Concrete tube conveying diameter(mm) | Φ*1 |
Overall dimension(L×W×H)(mm) | ***0×***0×***0 |
Total weight(kg) | ***0 |
Country: | China |
Model No: | BQ20 |
FOB Price: | 11999 ~ 17999 / Set ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 11999 per Set |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | Standard export packing for the mortar spraying pump |
Delivery Time: | Usually in 10 working days for the mortar spraying |
Supplying Ability: | 5000 Set per Month |
Payment Type: | T/T |
Product Group : | Pump |