FOB Price
Get Latest Price75 ~ 89 USD / Set ( Negotiable )
|2 Set Minimum Order
Country:
China
Model No:
DN-108
FOB Price:
75 ~ 89 USD / Set ( Negotiable )Get Latest Price
Place of Origin:
Foshan, China
Price for Minimum Order:
75 per Set
Minimum Order Quantity:
2 Set
Packaging Detail:
CKD, for better pls confirm with us
Delivery Time:
1 month for 5*40HQ containers
Supplying Ability:
159000 Cubic Meter per Month
Payment Type:
T/T, L/C, Western Union
Product Group :
-
Contact Person Toney
Foshan, Guangdong
DN***8
1.Painting:with 2 levels for better anti-rust.
2.Material: Iron Steel+ Wooden Panel(Particle Board.)
3.Metal: Cold
rolled & high carbon iron. thickness
> 1.2mm.
4.Frame and metal parts: shape like our pictures.
5.Edge:Cutting and sealing with Auto machine smothly.
6. Wooden Panel: Particle Board Panel with
veneer paper finished. MFC.
7.Table and frame: Fixed with bottle screw & connector &
Plastic Covers.
8.Legs frame finished: Siler powder-coated after Oxidation
treatment & Electrophoresis.
9.Metal other options: powder coated or painted the iron,
stainless steel or the aluminum alloy.
DN***8 office office table furniture Package: W D H Num CBM For
Table Top ***0 **0 *7 1 0.****9 For Side Table Top **0 **0 *7 1
0.****8 For Metal Frame Beam ***5 *0 *6 1 0.****6 For Table Frame
legs **0 **0 **0 1 0.****6 For Small Table Frame legs **0 **0 **0
0.5 0.****8 Summary CBM 0.****7
Loading capacity Dimension Volume *0GP *0GP
*0HQ mm CBM PCS PCS PCS ***0W****0D***0H 0.***3 **9 **8
**4
Country: | China |
Model No: | DN-108 |
FOB Price: | 75 ~ 89 / Set ( Negotiable ) Get Latest Price |
Place of Origin: | Foshan, China |
Price for Minimum Order: | 75 per Set |
Minimum Order Quantity: | 2 Set |
Packaging Detail: | CKD, for better pls confirm with us |
Delivery Time: | 1 month for 5*40HQ containers |
Supplying Ability: | 159000 Cubic Meter per Month |
Payment Type: | T/T, L/C, Western Union |
Product Group : | - |