FOB Price
Get Latest Price60 ~ 120 USD / Set
|50 Set Minimum Order
Country:
China
Model No:
-
FOB Price:
60 ~ 120 USD / Set Get Latest Price
Place of Origin:
weifang ,shandong
Price for Minimum Order:
60 per Set
Minimum Order Quantity:
50 Set
Packaging Detail:
1.Carton 2.PP film inside 3.Something environmental wrapping for exproting 4.According to the perfor
Delivery Time:
20 days after receipt 30% depoist
Supplying Ability:
5000 Set per Month
Payment Type:
L/C, T/T
Product Group :
-
Contact Person Tracy
shouguang daotian industrial, Weifang, Shandong
width :**2m thickness
:3mm Feature :corrosion protection height
:**4m beam :*0**0*1.5 or as require
1.By using the fork man, the goods can betransported to the second and third floor.
And then they can be sent to the fixed area by using the pallet jack or flat truck.
2. Attic rack usually uses the rack upright frame as the supporter. The steel shelf
panel has a big load capacity with the advantages of low cost and easy installment.
3. Mezzanine racking is suitable for the fields of warehouse in a big height, little goods,
unloading it manually and big storage quantity. It can be used in the fields of car industries, electric mechanic and so on.
Country: | China |
Model No: | - |
FOB Price: | 60 ~ 120 / Set Get Latest Price |
Place of Origin: | weifang ,shandong |
Price for Minimum Order: | 60 per Set |
Minimum Order Quantity: | 50 Set |
Packaging Detail: | 1.Carton 2.PP film inside 3.Something environmental wrapping for exproting 4.According to the perfor |
Delivery Time: | 20 days after receipt 30% depoist |
Supplying Ability: | 5000 Set per Month |
Payment Type: | L/C, T/T |
Product Group : | - |