FOB Price
Get Latest Price12000 ~ 48000 USD / Piece
|1 Piece Minimum Order
Country:
China
Model No:
GT-CJA475
FOB Price:
12000 ~ 48000 USD / Piece Get Latest Price
Place of Origin:
-
Price for Minimum Order:
12000 per Piece
Minimum Order Quantity:
1 Piece
Packaging Detail:
wooden case specially for the order dimension
Delivery Time:
80 days after order official confirmation
Supplying Ability:
400 Piece per Year
Payment Type:
T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal, Other
Product Group :
Contact Person Feng
Shenyang, Liaoning
Pelton turbine suit to water head
**0 to ***0 meters with certain small flow. It could vertical and
horizontal arrangement, nozzle numbers from one to six. Pelton
turbine with features of wide flow high efficiency region. It
could start turbine with *0% of rated flow. Pelton turbine with
one or two nozzles usually adopt horizontal arrangement, but
multiple nozzle Pelton turbine adopts vertical arrangement.
Pelton turbine units are wildly used in mountain area all over
the world, and well known by its simple structure, less
investment, high efficiency, and reliable long service
life.
Model: CJA**5...
Net Head: **0 m
D1 (Pitch Diameter): ***0 mm
Output Power: ***0 kW
Net Weight: ***0 KG
Material: ASTM A**3p CA6NM
With Three Nozzles
*5 Buckets
1,Suitable water head : ******0m
2, Output scope : **0Kw **0Mw
3, Runner diameter : *5cm ***0cm
4,Runner material :cast or forged stainless steel
5, Arrangement type : Vertical and Horizontal
6, Nozzle numbers : **6
Pelton runner manufacture workmanship has been improved sharply in recent years. The runner could be wholly casted or forged stainless steel and then be shaped and polished by digital control machine tool. Pelton runner has been manufactured by us all this high strength, higher efficiency, and longer service life. The factory tests including static and dynamic balance test, UT test, and dimension measurement.
Country: | China |
Model No: | GT-CJA475 |
FOB Price: | 12000 ~ 48000 / Piece Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 12000 per Piece |
Minimum Order Quantity: | 1 Piece |
Packaging Detail: | wooden case specially for the order dimension |
Delivery Time: | 80 days after order official confirmation |
Supplying Ability: | 400 Piece per Year |
Payment Type: | T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal, Other |
Product Group : | Micro hydroelectric power plant |