Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 11 Million Importers & Exporters globally. Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Moble Q235 factory sale frame steel pipe scaffolding Moble Q235 factory sale frame steel pipe scaffolding
Next

Moble Q235 factory sale frame steel pipe scaffolding

FOB Price

Get Latest Price

1200 ~ 2000 USD / Ton ( Negotiable )

|

10 Ton Minimum Order

Country:

China

Model No:

frame steel pipe scaffolding

FOB Price:

1200 ~ 2000 USD / Ton ( Negotiable ) Get Latest Price

Place of Origin:

CHINA

Price for Minimum Order:

1200 per Ton

Minimum Order Quantity:

10 Ton

Packaging Detail:

Coupler packed in 25pcs/ PP woven bags, 40bags/ Metric ton bag Steel pipe packed in steel belt or ir

Delivery Time:

Within 10 to 25days

Supplying Ability:

500 Ton per Month

Payment Type:

T/T, L/C, Western Union, PayPal

Product Group :

-

Contact Now
Free Member

Contact Person Matt

Beijing, Beijing

Contact Now

Product Specification

  • Product:Frame steel pipe scaffolding
  • Material :Q235 carbon steel, Q345, Q195
  • Surface treatment :Electronic galvanized, hot galvanized and print
  • Color :Red, blue, yellow, green, bright galvanized
  • Package :Steel pipe packed in steel belt or iron pallet
  • Accessories:Wedge pin, ring plate, standard, ledger
  • Standard :EN74/ BS1137/ JIS
  • Production capability:50000pieces/month
  • Coupler type:British type, American, German
  • MOQ:100pcs

Product Description

Moble Q**5 factory sale frame steel pipe scaffolding
 
Frame steel pipe scaffolding
The frame scaffolding is the most widely used in the construction. Its named frame because the shape is same with the door. And its called the scaffold and portal frame. It contains with the main frame, across frame, cross brace, scaffold floor and jack base. The frame scaffolding is developed by the American at first, it has the feature of simple dismounting, good load-carrying properties and safety using.
Material: Q**5, Q**5, galvanized pipe which is welded
Surface treatment: Galvanized, print
Package: Bind with the steel belt or steel pallet
 
Basic information of scaffolding:
Product Frame scaffolding 
Material  Q**5 carbon steel, Q**5, Q**5
Surface treatment  Electronic galvanized, hot galvanized and print
Color  Red, blue, yellow, green, silver
Package  Steel belt or iron plate/Customized
Accessories Frame, cross braces, U head jack, pipe joint
MOQ **0pcs
Delivery detail Payment ****5 Days After Receiving The Deposit & Confirm All Information
Payment Standard *0% deposit by T/T, pay for the balance when you see the copy of B/L
Standard  EN*4/ BS***7/ JIS
Production capability ****0 pieces/month
 
Advantage:
  • The standardization the physical dimension for the frame scaffolding
  • Reasonably structured, good load-carrying capability and strength bearing capacity 
  • Easy to tear down and install, high erecting efficient, save the time and labor, safe and reliable, affordable, convenience to transport and strength universality.
  • The frame scaffolding is accounted for more than *0%, which is used at most and universal. 
 
Application:
1. Used for buildings, halls, bridges, overpass, tunnel and other template supporting roof or fly die within the frame
2. Used For high-rise building inside and outside scaffolding
3. Used for mechanical and electrical installation, ship hull building and other decoration engineering activities of the working platform.
4. Used frame scaffold and simple frame of roof, can constitute a temporary site dormitory, the warehouse or barrack.
5. Used for erection of temporary reviewing stand and stand.

Country: China
Model No: frame steel pipe scaffolding
FOB Price: 1200 ~ 2000 / Ton ( Negotiable ) Get Latest Price
Place of Origin: CHINA
Price for Minimum Order: 1200 per Ton
Minimum Order Quantity: 10 Ton
Packaging Detail: Coupler packed in 25pcs/ PP woven bags, 40bags/ Metric ton bag Steel pipe packed in steel belt or ir
Delivery Time: Within 10 to 25days
Supplying Ability: 500 Ton per Month
Payment Type: T/T, L/C, Western Union, PayPal
Product Group : -

Send a direct inquiry to this supplier

To:

Matt < Beijing Haopeng Century International Trade Co., Ltd >

I want to know: