FOB Price
Get Latest Price( Negotiable )
|1 Case Minimum Order
Country:
China
Model No:
-
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Case
Packaging Detail:
nude
Delivery Time:
15 to 20 days
Supplying Ability:
20 Case per Month
Payment Type:
T/T
Product Group :
Contact Person Roy
Beijing, Beijing
Choosing the correct separation mud plant is every bit as important as choosing the correct TBM for the project. Using the geotechnical data, the separation plant should be designed to accommodate the majority of the material expected to be processed. Due to the unknown factors that can affect the tunneling advance rate, the contractor must have adequate separation equipment to allow the contractor to move forward at an unimpeded rate when the tunneling conditions are favorable.
Country: | China |
Model No: | - |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Case |
Packaging Detail: | nude |
Delivery Time: | 15 to 20 days |
Supplying Ability: | 20 Case per Month |
Payment Type: | T/T |
Product Group : | Tunneling project |