FOB Price
Get Latest Price98 ~ 198 USD / Cubic Meter ( Negotiable )
|1 Cubic Meter Minimum Order
Country:
China
Model No:
-
FOB Price:
98 ~ 198 USD / Cubic Meter ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
98 per Cubic Meter
Minimum Order Quantity:
1 Cubic Meter
Packaging Detail:
12-20 days after receiving the deposit
Delivery Time:
packed in carton with plastic woven bag inside, al
Supplying Ability:
50000 Cubic Meter per Year
Payment Type:
T/T, L/C
Product Group :
Contact Person monica
Tianjin, Tianjin
No-asbestos Calcium Silicate
Insulation Pipe /Board
1.no middlemen profit
2.**0%no asbestos
3.Excellent fireproof property
4.Excellent waterproofness
5.Good
durability
Appliton
1.Crude oil pipeline
2.Steel pipe insulation
3.Steam thermal insulation
4.Duct heat insulation
5.Gas pipeline insulation
6.All kinds of channel heat insualtio
PackagingDetails: | packed in carton with plastic woven bag inside, also can be package as client's requirement |
---|---|
DeliveryDetail: | ****0 days after receiving the deposit |
Country: | China |
Model No: | - |
FOB Price: | 98 ~ 198 / Cubic Meter ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 98 per Cubic Meter |
Minimum Order Quantity: | 1 Cubic Meter |
Packaging Detail: | 12-20 days after receiving the deposit |
Delivery Time: | packed in carton with plastic woven bag inside, al |
Supplying Ability: | 50000 Cubic Meter per Year |
Payment Type: | T/T, L/C |
Product Group : | calcium silicate |