Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 11 Million Importers & Exporters globally. Join Now |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
outdoor LED tunnel light
Next

outdoor LED tunnel light

FOB Price

Get Latest Price

|

1 Piece Minimum Order

Country:

China

Model No:

BQ-SD560-120W-L

FOB Price:

Get Latest Price

Place of Origin:

Guangdong, China

Price for Minimum Order:

-

Minimum Order Quantity:

1 Piece

Packaging Detail:

-

Delivery Time:

in 1 to 3 days for samples , in 15 days for mass

Supplying Ability:

50 Piece per Day

Payment Type:

T/T, Western Union

Product Group :

Contact Now
Free Member

Contact Person Ms. Doris

9 Buliding,Yusheng Industry Park Xixiang ,Baoan,, Shenzhen

Contact Now

Product Specification

Product Description

Model No.:outdoor LED tunnel light BQ-SD******0W-L

 

Modle

BQ- SD******0W-L

Voltage(V)

AC( **- **5V) / **- *0HZ

Power(W)

2**0

Power factor (PF)

>0.*5

LED efficiency

**- **0lm/W

Lumens(Lm)

**********0Lm

Fixture efficiency

>*5%

 

 

Features:

1.Compared with traditional HPS or Mercury tunnel lighting, our LED tunnel lights save0.5 to 0.*5 electricity cost.

2.Lifespan is 3 and  5 more times than lifespan of HPS, metal halide and halogen lamps.

3.Reduced operating costs and easy maintenance

4.No replacement of lamp or ballast

5.No ill glare, abrupt or frequent flashes.

6.Smaller UPS and/or generators for emergency back up (save space and· money)

7.Eco-friendly  no UV, IR, lead, mercury or air pollution.

 

Application: 

The lights could be used in tunnel, metro, bus station, underground parking garage, gym, square, advertising board ,wide area lighting and architecture lighting and so on 


Country: China
Model No: BQ-SD560-120W-L
FOB Price: Get Latest Price
Place of Origin: Guangdong, China
Price for Minimum Order: -
Minimum Order Quantity: 1 Piece
Packaging Detail: -
Delivery Time: in 1 to 3 days for samples , in 15 days for mass
Supplying Ability: 50 Piece per Day
Payment Type: T/T, Western Union
Product Group : LED tunnel light

Send a direct inquiry to this supplier

To:

Ms. Doris < HK BEEQOO OPTOELECTRONICS GROUP CO., LIMITED >

I want to know: