FOB Price
Get Latest Price|
1 Set Minimum Order
Country:
China
Model No:
-
FOB Price:
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
wooden case for parts
Delivery Time:
3 months
Supplying Ability:
20 Set per Month
Payment Type:
T/T, L/C
Product Group :
-
China
Contact Person Mr. Kay
West Weihua Road, Xinxiang, Henan
This overhead crane for power plants is employed to lift and assemble stator, steam turbine stator and rotor in power plants, which has the features of light weight, low energy consumption and less maintenance.
We develop crane software by 3D modeling and finite element analysis and optimize lifting mechanism and steel structure. The use of high strength materials increase carrying capacity and reduce weight with less wheel load pressure.
Features of Overhead Crane for Power Plants:
1. Saving working space: small limit of left and right space to increase the working space. Small space over the track/rail, thus the workshops space can be fully used.
2. Less cost of service and maintenance: reliable performance and durability to reduce extra cost. High quality and performance components need less maintenance and repair. Low energy consumption.
3. High performance: Adopt frequency conversion tech to lower operating load and make the crane traveling in high speed within light load. Its 1:*0 speed range insures the crane traveling smoothly and reduces the impact to workshop.Anti-sway technology to realize precise positioning.
Country: | China |
Model No: | - |
FOB Price: | Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | wooden case for parts |
Delivery Time: | 3 months |
Supplying Ability: | 20 Set per Month |
Payment Type: | T/T, L/C |
Product Group : | - |