FOB Price
Get Latest Price( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
GSJ65/GSJ75/GSJ90/GSJ120/GSJ150
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
Wood pallet covered by plastic film
Delivery Time:
60 working days since the date of receiving deposi
Supplying Ability:
300 Set per Year
Payment Type:
T/T
Product Group :
China
Contact Person Mr. Felix
Tangshi, Zhangjiagang, Jiangsu
1). High efficiency:(production lineal speed is increased over
2times)
Old line: *0mm(single)—max. *2m/min. *0mm (dual)**-max.
7min/min.
New line *0mm (single)—max. *5m/min. *0mm(dual)**-max. *5m/min.
2). Low power consumption; (save electrical power *0%)
Old design: ****3mm(dual) output **0kg/h, Total power: **3kw
(*0%=**0kw), 0.5kw/kg
New design ****3mm (dual) output **0kg/h Total power: **8kw
(*0%=**0kw) 0.*5kw/kg
3) Less man power (only ½labor cost)
Operate one old design ****3mm line will need 2 operators, they can
produce pipe**0kg/h.
Control one new design line will need 2 operators, too, but they
can produce pipes **0kg/h.
4) High automation system (easy operation)
Adopt German Siemens PLC controlling system, automatical and
intelligent alarm, wake up and heating function.
5) Save **6% materials and high uniform quality of end products
.
Gravimetric dosing unit control the products weight permeter,
reduce the unqualified products and save the raw materials.
Country: | China |
Model No: | GSJ65/GSJ75/GSJ90/GSJ120/GSJ150 |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | Wood pallet covered by plastic film |
Delivery Time: | 60 working days since the date of receiving deposi |
Supplying Ability: | 300 Set per Year |
Payment Type: | T/T |
Product Group : | Extrusion Technology |