FOB Price
Get Latest Price650 ~ 750 USD / Ton ( Negotiable )
|10 Ton Minimum Order
Country:
China
Model No:
-
FOB Price:
650 ~ 750 USD / Ton ( Negotiable )Get Latest Price
Place of Origin:
China ,shandong
Price for Minimum Order:
650 per Ton
Minimum Order Quantity:
10 Ton
Packaging Detail:
Weld square tube frame
Delivery Time:
15 to 35 days
Supplying Ability:
5000 Ton per Month
Payment Type:
T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal
Product Group :
Contact Person Cherry Sun
Qingdao, Shandong
Please Contact Me For More Photos Videos Free Design And Best Price
Cherry Sun
E: *(@********************ion.com
Mobile
: **************7 ( WeChat /WhatsApp )
A: Room **1, Building *2 ,Tian An cyber city, Chengyang district
, Qingdao, China
Steel Structure House, Steel Structure Materials, Steel Structure Parts,Steel Structure Frame Factory
Steel Structure Construction ,Steel Frame Structure,Structural Steel, Iron And Steel Company From China
Description
Steel structure workshop included the main structure (steel
beam/girder, steel column/pillar), the secondary structure( roof
and wall purlin, steel bracing, tie-bar etc), door and windows,
and other accessories.
Application
Inidustry: Wokeshop, warehouse, and other industry
facilities.
Commerce: Mall, hotel, exhibition hall, office building.
Public: School, library, sports stadium, churce, etc.
Advantages
1. Prefabricated. Fast and easy
installation, time saving and labor saving.
2. Customized design, various
layout, beautiful appearances, different colors for the walls and
roof
3. light weight, easy move and cost
saving,
4. Removable,convenient to assemble
or disassemble. Fast construction and easy installation
5. Environmentally, recycle, no
waste produced
6. High strength, can
resistance grade 8 earthquake
water proof, fire proof; can resists strong wind and heavy
snow.
7. Long life span.can be used for more
than *0 years.
8. Wide span , single or
multiple spans, can have a maximum span distance in *6m
without middle columns.
structure
Specifications |
1)Size: MOQ is **0m2, width X length X eave height, roof slope |
2)Type: Single slope, double slope, muti slope; Single span, double-span, Multi-span, single floor, double floors! | |
3) Base: Cement and steel foundation bolts | |
4) Column and beam: Material Q**5(S**5JR)or Q**5(S**5JR) steel, all bolts connection! Straight cross-section or Variable cross-section! | |
5) Bracing: X-type or V-type or other type bracing made from angle, round pipe, etc | |
6) C or z purlin: Size from C**0~C**0, Z**0~Z**0 | |
7) Roof and wall panel: Single colorfull corrugated steel sheet0.**6~0.8mm thick, (***0mm wide), or sandwich panel with EPS, ROCK WOOL, PU etc insulation thickness around *0mm~**0mm, | |
8)Surface: Two lays of Anti-rust Painting! |
Design Parameters |
Size: width X length X eave height, roof slope |
1)Live load on roof(KN/M2) Wind speed(KM/H) | |
2) The function of building, the interior equipmet | |
3) The special requirement on function | |
4)Earthquake load if have.
Snow load (KG/M2) 5) Demands for doors and windows |
|
6)Crane (if have), Crane span, crane lift height, max lift capacity, max wheel pressure and min wheel pressure! |
Steel
Structure Process:
1. Prepare raw materials : cut steel
plate or use internation size H section steel and angle
steel, round tube, round steel, square tube etc.;
2. Assembly and welding: our welders
will follow the drawings to assemble the steel members and weld
them together as a entire beam/column/brace and so
on; (Our quality inspector will check the steel
pieces after finish welding, this is the first quality
check)
3. Sand blast : After finish welding
and polishing, our sand blast effect can reach internation 2.5
high grade, very good for resist rust; (Secondary
quality check)
4.Paint : Within 2 hours after sand
blast, all the steel members should be paint. Client can choose
any color and any brand of paint. (The third quality
check)
5. Inspect the goods by client : After
we finish a part of fabrication work, we will invite clients
to check the goods before we pack the steel frame.
6.Packing and loading : If clients require
us to load the goods by close containers, we will pack the steel
structure members one by one on the steel skid and tie the whole
steel package well. (The fourth quality
check )
Packing: Main steel frame without packing load in *0' OT,
roof and wall panel load in *0' HQ! Or according to
customer's requirement.
Installation service
* Layout plan can be designed if
needed.
* Installation introduction / CD
/ installation drawing will be provided if
needed.
* Engineers and workers can be sent
abroad for guidance and installation.
About
Us
1. Founded in the year of
***3,professional in various prefab houses and
container houses and steel structure making.
2. More than *0 R&D staff and more than **0
workers
3. *5, **0 square maters factory,
full line production
4. Qualification: CE(DIN****0),
ISO***1, BV, SGS; ( CSA, AS/NZS, UL etc. )
5. High Construction Efficiency, delivery time
will be within *0 to *0 days
Contact
:
Cherry
Sun
Mobile:
**************7
Country: | China |
Model No: | - |
FOB Price: | 650 ~ 750 / Ton ( Negotiable ) Get Latest Price |
Place of Origin: | China ,shandong |
Price for Minimum Order: | 650 per Ton |
Minimum Order Quantity: | 10 Ton |
Packaging Detail: | Weld square tube frame |
Delivery Time: | 15 to 35 days |
Supplying Ability: | 5000 Ton per Month |
Payment Type: | T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal |
Product Group : | steel structure workshop |