FOB Price
Get Latest Price30 ~ 80 USD / Square Meter
|100 Square Meter Minimum Order
Country:
China
Model No:
YDSS001
FOB Price:
30 ~ 80 USD / Square Meter Get Latest Price
Place of Origin:
-
Price for Minimum Order:
30 per Square Meter
Minimum Order Quantity:
100 Square Meter
Packaging Detail:
packed with blanket, film and carton
Delivery Time:
Seaworthy delviery, packed into 40' OT and 40
Supplying Ability:
3000 Ton per Month
Payment Type:
T/T
Product Group :
Contact Person Raymond
Weifang, Shandong
Professional Manufacturer
Steel Structure
for workshop,warehouse,hall,shed
FAQ:
Q: What is the Size for this steel structure building,
width*length, eave height, column space (with/without crane)
A, width, as your requirement. Length, as your requirement. Height,
as your requirement. Crane, as your requirement.
Q: What is the material for this steel structure building?
A; Main Steel frame is Q**5; Secondary steel frame is Q**5B; Purlin
is Q**5or galvanized C type steel, Z type steel.
Q, what is the model and slope for this steel structure
building?
A, double pitch roof with middle column, *0% slope.
Q, what is the material for the roof and wall in this steel
structure building?
A, eps/rockwool/glasswool sandwich panel or single steel sheet
Q, what type door and window in this steel structure building?
A, door is slding door/sliding door, window is Aluminium alloy
window/plastic steel window
Q, What is the type for the steel structure building?
A, light steel structure, portal frame
Q, what is usage for the steel structure building?
A, steel structure Industrial Plant/Factory
Steel structure Industrial workshop
Steel warehouse /steel structure godowns
Steel structure commercial facility
Q, What is the advantage for steel structure building?
A, 1, light weight for steel frame
2, Steel frame is stable.
3, Good vibration resistance, impact resistance for steel
structure
4, Manufacture for steel structure is with high
industrialization.
5, Easy assemble for steel structure
6, Large space in steel structure building
7, Material for steel structure can be recycled.
8. Short construction period
Q: Steel structure factory building fire prevention
performance?
A: Mainly adopts fireproof coatings, foam fire retardant paint, and
fire protection measures such as casing.
Q: The steel structure factory building common economic
anticorrosive measures?
A, 1, hot dip galvanized, hot dip galvanized after rust removal of
steel structure components in **0 degree centigrade high
temperature melting zinc liquid, make the zinc layer adhered on the
surface of the component, the advantage of this approach is durable
life, long-term anti-corrosion, high industrialization degree,
stable quality
2, coating: Coating method is not better than long-term
anticorrosion method, but the fixed number of year of the fluorine
carbon coating corrosion resistance can be up to *0 years, it is
been used widely in indoor structure or for ease maintenance
outdoor steel structure, with lower cost, but when used in outdoor
it requires constant maintenance.
3, Cathodic protection, widely used in the underwater or
underground structure
Processing technology of the steel structure product
Including the selection of process flow, layout, marking, cutting,
straightening, molding, edge processing, making holes, friction
surface processing, end processing, component assembly, assembly
pipe processing components and steel members.
Technology services
1, the customer can provide drawings, we processed based on the
drawings.
2, We can design according to customer's requirements, based on the
information customer offered.
transport
It is can be loaded in containers. Main steel structure part loaded
in *0 OT containers and small part, wall panel, roof panel loaded
in *0 HQ.
packing and delivery:
Country: | China |
Model No: | YDSS001 |
FOB Price: | 30 ~ 80 / Square Meter Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 30 per Square Meter |
Minimum Order Quantity: | 100 Square Meter |
Packaging Detail: | packed with blanket, film and carton |
Delivery Time: | Seaworthy delviery, packed into 40' OT and 40 |
Supplying Ability: | 3000 Ton per Month |
Payment Type: | T/T |
Product Group : | steel structure |