FOB Price
Get Latest Price|
- Minimum Order
Country:
South Korea
Model No:
-
FOB Price:
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
Product Group :
-
South Korea
Contact Person Ms. SunHyo
Dong Sang Dong, KimHae City, KyoungNam
PVD Machine
Prefabricated Vertical Drain
It is one of the method to improvement the underlying compressible
soils.
It is combined with Preloading ground improvement method.
The objective of using the vertical drains with preloading
technique is to accelerate the rate of consolidation and to
minimize future settlement of the treated area under the future
dead and live loads.
Soil improvement works is carried out in such a way that specified
degree of primary consolidation is designed to be attained within
the desired time frame by improving the soil drainage system.
Country: | South Korea |
Model No: | - |
FOB Price: | Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | - |
Packaging Detail: | - |
Delivery Time: | - |
Supplying Ability: | - |
Payment Type: | - |
Product Group : | - |