FOB Price
Get Latest Price10 ~ 15000 USD / Piece ( Negotiable )
|1 Piece Minimum Order
Country:
China
Model No:
-
FOB Price:
10 ~ 15000 USD / Piece ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
10 per Piece
Minimum Order Quantity:
1 Piece
Packaging Detail:
packing in wooden cases
Delivery Time:
2-3 weeks
Supplying Ability:
5000 Piece per Month
Payment Type:
T/T
Product Group :
Contact Person Ms. becky
Shajing, Shenzhen, Guangdong
Reactive
power compensation reactor is installed in the reactive
compensation cabinet to limit switching current and operate over
voltage, protecting the capacitor in the power factor correction
system, absorbing harmonic current in the power grid, improving the
voltage waveform in the system, reducing harmonic pollution,
increasing the power factor and improving the quality of power
network.
Technical parameters
1. Normal line voltage:
**0V***0V
2. Compensation power:
6.****0Kvar
3. Reactance ratio:
5.*7%,7%,*4%
4. Overload capacity: 1.*5
times the load for long time security
operation
5. linearity ≥
0.*5Ln
6. Dielectric
strength: winding-earth **0VAC/*0Hz/*0s
no arcing or breakdown
7. Insulation
resistance: winding-earth, cross-core screw
rob - earth **0VDC,
insulation resistance value ≥**0MΩ
8. Noise level
< *5dB (The
testing point's horizontal distance from transformer should be
1 metre.)
9, Protection degree:
IP*0
*0. Insulation
class: H
*1. Product standards:
IEC**9:***7 Reactors
GBI******8 Reactor
(EQV IEC**9:***7)
Application environment
and conditions:
1, The altitude is not more than ***0
meters and if more than ***0 meters, derating is
required.
2,
Running temperature: *5 ℃-*0
℃, relative humidity is less than
*0%.
3,
Without harmful gas, inflammable, explosive and conductive dust
around.
Country: | China |
Model No: | - |
FOB Price: | 10 ~ 15000 / Piece ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 10 per Piece |
Minimum Order Quantity: | 1 Piece |
Packaging Detail: | packing in wooden cases |
Delivery Time: | 2-3 weeks |
Supplying Ability: | 5000 Piece per Month |
Payment Type: | T/T |
Product Group : | Reactor |