FOB Price
Get Latest Price18 ~ 38 USD / Piece
|50 Piece Minimum Order
Country:
China
Model No:
reusable plastic building construction formwork material
FOB Price:
18 ~ 38 USD / Piece Get Latest Price
Place of Origin:
China
Price for Minimum Order:
18 per Piece
Minimum Order Quantity:
50 Piece
Packaging Detail:
Carton and tray
Delivery Time:
5-10days
Supplying Ability:
1000 Piece per Day
Payment Type:
T/T, L/C, Western Union, Money Gram, PayPal
Product Group :
Contact Person Ms. Luna
Jiaozuo, Henan
The building formwork is a temporary
supporting structure, which is made according to the design
requirements, so that the concrete structure and members are shaped
according to the specified position and geometrical dimensions,
maintaining their correct position, and bearing the self-weight of
the building formwork and the external load acting on it. The
purpose of the formwork project is to ensure the quality of
concrete works and construction safety, speed up construction
progress and reduce engineering costs.
The building formwork structure used for the
construction of cast-in-place concrete structures is mainly
composed of three parts: panel, support structure and connecting
parts. The panel is a bearing plate directly contacting the newly
poured concrete; the supporting structure is a temporary structure
supporting the panel, the concrete and the construction load,
ensuring that the building formwork structure is firmly combined so
as not to be deformed or damaged; the connecting piece is the panel
and the supporting The structure is connected into an integral
fitting.
Â
1.Q: Are you a factory or trading company?
A: We are a factory of reusable construction formwork material.
2.Q: How can I get some samples?
A: We are honored to offer you free samples.
3.Q: How does your factory control quality?
A: Quality is priority. We always control from the very beginning to the end , from the raw materials to the production. Every batch of materials, we must test the quality about the impact stength , Vicart , bending strength. Our factory has gained ISO***1:***8.
4.Q: How many times does your formwork reused?
A:It can be reused over *0 times.
5.Q: Does this formwork stick concrete? and easily remove or not?
A:It doesn't stick concrete and easily remove, even no need any release agent, only tapping can fallen off.
6.Q: How to clean the used formwork?
A: Only using the high-pressure water gun can make it clean.
7. Q: what are your foreigh markets?
A: Middle East countries, Africa countries, the eastern European countries,Oceania countries
Country: | China |
Model No: | reusable plastic building construction formwork material |
FOB Price: | 18 ~ 38 / Piece Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | 18 per Piece |
Minimum Order Quantity: | 50 Piece |
Packaging Detail: | Carton and tray |
Delivery Time: | 5-10days |
Supplying Ability: | 1000 Piece per Day |
Payment Type: | T/T, L/C, Western Union, Money Gram, PayPal |
Product Group : | plastic concrete building formwork |