FOB Price
Get Latest Price( Negotiable )
|10 Ton Minimum Order
Country:
China
Model No:
-
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
10 Ton
Packaging Detail:
-
Delivery Time:
15 to 20 days
Supplying Ability:
200 Ton per Week
Payment Type:
T/T
Product Group :
Contact Person Mr. Allen
Brocade Group, No. 9 Gangxing Road, Jinan, Shandong
Cold drawn seamless steel pipe is made from a seamless steel
hollow. It is further processed by cold drawing over a mandrel, to
control the ID, and through dies to control the OD. CDS is
superior in surface quality, dimensional tolerances and strength
when compared to hot finished seamless tubing.Due to the
characteristics of high-precision, in precision machinery
manufacturing, auto parts, hydraulic cylinders, construction (steel
sleeve) industry has a very wide range of applications.
Size: *6mm**9mm
W.T.: 0.8mm**8 mm
Shape: Round
Production type: Cold drawn or cold rolled
Length: Single random length/ Double random length or as customers
actual request max length is *0m.
Annealing
After the goods are cold drawn to sizes, the tubes are put on
annealing furnace for heat treatment and normalising.
Straightening
Post annealing, the goods are passed through a seven roller
straightening machine to achieve proper straightening of the
tubes
Eddy current
Post straightening, each tube is passed through eddy current
machine to detect for surface cracks and other defects . Only the
tubes that pass eddy current are fit for delivery to customers.
Finishing
Each tube is either oiled with corrosion resistant oil or varnished
for surface protection and corrosion resistant as per customers
requirement, each tube end is covered by plastic end caps to avoid
damage in transit, the marking and specs are put and the goods are
ready for dispatch.
Country: | China |
Model No: | - |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 10 Ton |
Packaging Detail: | - |
Delivery Time: | 15 to 20 days |
Supplying Ability: | 200 Ton per Week |
Payment Type: | T/T |
Product Group : | Alloy steel pipe |