FOB Price
Get Latest Price|
- Minimum Order
Country:
Turkey
Model No:
-
FOB Price:
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
Product Group :
-
Contact Person Mr. Baruh
kozyatagi mah. degirmen sok. no 18 kat 18, Istanbul, Turkiye
SAW-Spirally Welded Pipes
SAW spirally welded steel pipes in the following standards according to usage areas.
-Gas and petroleum pipelines, API 5L
-Water pipelines, AWWA C***0, BS **4, DIN ***0,
DIN ***6, TS ***7, UNI ***3
-General purpose pipes, BS ***1, DIN***6
-Piling pipes, ASTMA ***2
-Pipes specials and fittings, AWWA C***8, BS
**4
PRODUCTION RANGE
Outside Diameter (ø) : From 8" (**9.1 mm) upto
**0" (***8 mm)
Wall Thickness : From 0.**7" (4mm) upto 1" (*5.4
mm)
Below detailed outside coating and inside lining can be applied to the pipes in order to eliminate corrosive medium effects.
Outside Coating
Epoxy Coating according to AWWA C***0
Bitumen Coating according to DIN ****3, BS **4
Coal-Tar Enamel Coating according to AWWA C***3
3 Layer Polyethylene Coating according to DIN ****0
3 Layer Polypropylene Coating according to DIN ****8
Inside Lining
Epoxy Lining according to AWWA C***0
Bitumen Lining according to DIN ****3, BS **4
Coal-Tar Enamel Lining according to AWWA C***3
Cement Mortar Lining according to AWWA C***5, BS **4
COMPLETE PROJECT
MANAGEMENT
In order to assure a smooth and on-time delivery, the "project" should be managed with utmost care and all external or unpredictable factors should be taken into consideration in advance.
Any sophisticated supply project essencially includes (but not limited to) "negotiations", "time scheduling", "quality assurance", "delivery"…
However, as for a steel pipe supply project, some administrative and operational steps comes to the forefront, which naturally affects the project, such as specifying the most appropriate production and shipping plan, warehousing (if needed), organizing the inspection of the production and loading, coordinating the whole transportation process including inland hauling and handling customs clerance procedures, and tracking the transportation as well.
Nevertheless, ODELYA's responsibilities for any project never
ends at a definite point, regardless of the delivery or payment
terms. We carefully arrange and manage each step of a project,
from negotiations to the delivery to the "ultimate" destination
place.
QUALITY
ASSURANCE
To avoid "no-return" damages to the supply project, the risks should be estimated so carefully and characterized in detail.
Thus, importance of such quality-based approach make a comprehensive quality management compulsary, not only for the production but also for the loading and shipment as well. Specifically determining the most appropriate production plan, inspiring our manufacturer partners to innovation and common senses for caring about the quality…
Appointing (independent) "third party inspection" (TPI) organizations and coordinating the inspection plan of the production and loading steps…
These all assure the premium quality of our strategical project management.
INSPECTION TEST PLAN & QUALITY PLANBefore starting the production, reaching to an multiletral agreement is required for a smooth production and loading. Therefore, each single details of the production and testing phases, from from raw material inlet point to the loading to the transportation vehicles is negotiated by the parties. In no way, the production starts unless the all parties are fully satisfied with the stipulated inspection test plan. In the center of these negotiations, thanks to our experience in various projects and technical knowledge in the area of steel pipe technologies, we are so ready to puzzle over the whole plan and offer the most proper solutions.
THIRD PARTY INSPECTION (TPI)We appoint worldwide-known independant inspection companies (Third Party Inspection -TPI) companies to inspect the quality of material, production and loading steps in case of any undesirable incidents relating any step of production and shipment.
Country: | Turkey |
Model No: | - |
FOB Price: | Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | - |
Packaging Detail: | - |
Delivery Time: | - |
Supplying Ability: | - |
Payment Type: | - |
Product Group : | - |