Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 11 Million Importers & Exporters globally. Join Now |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
scaffolding clamps, scaffold coupler, fixed clamp, double clamps
Next

scaffolding clamps, scaffold coupler, fixed clamp, double clamps

FOB Price

Get Latest Price

|

20 Ton Minimum Order

Country:

China

Model No:

scaffold parts

FOB Price:

Get Latest Price

Place of Origin:

Hebei,China

Price for Minimum Order:

-

Minimum Order Quantity:

20 Ton

Packaging Detail:

suitable for sea transport

Delivery Time:

within 15 days after payment

Supplying Ability:

500 Ton per Day

Payment Type:

T/T, L/C

Product Group :

-

Contact Now
Free Member

Contact Person Ms. Fan

Changli, Qinhuangdao, Hebei

Contact Now

Product Description


XMWY  SCAFFOLDING & FORMWORK

 

 

New Building System

 

 

Instead of steel pipe & couplers or timbers, our scaffolding&formwork system are made of quality steel with simple handling.Being featured of flexible&adjustable, this system is suitable to various project, achieving high construction efficiency, zero-material wasting and low-costing all at same time.

 

Main Products

 

1. Scaffolding & Formwork System for Slab

2. Formwork System for Wall

3. Formwork System for Column 

Other scaffolding parts like scaffold pipe, shoring props, types of scaffolding couplers, galvanized steel planks and stairway are also available as per customers' requirement.

 

Unique Features

 

*Vertical Beam adjustable 

*simple system

*electrophoretic painting

*sizes free to different project

 

Advantages 

   

1)electrophoretic: water-based paint, no pollution to the air

2)simple & quick to assemble and disassemble

3) keep construction site neat and clean 
4)can be cycle-used for **0 times at least 

5)help forming smooth concrete surface



Related products:

 

scaffolding system,steel scaffold parts and couplers, formwork system, scaffold frame, scaffold props,shuttering materials, base jack, plywood supporting,post shore,  shoring props, steel pipe,galvanized scaffold plank,formwork accessories scaffolding coupler, double scaffold clamp, scaffod pipe clamp, scaffolding fixed clamp, beam clamps, scaffolding swivel clamp,single scaffold clamp, scaffolding joint clamp, fixed scaffold coupler, scaffold girder coupler, scaffold clip, swivel scaffold coupler for *8.3mm pipes, pressed scaffolding coupler, pressed swivel coupler, drop forged coupler,galvanized scaffold clamp


Country: China
Model No: scaffold parts
FOB Price: Get Latest Price
Place of Origin: Hebei,China
Price for Minimum Order: -
Minimum Order Quantity: 20 Ton
Packaging Detail: suitable for sea transport
Delivery Time: within 15 days after payment
Supplying Ability: 500 Ton per Day
Payment Type: T/T, L/C
Product Group : -

Send a direct inquiry to this supplier

To:

Ms. Fan < Xing Min Wei Ye Architecture Equipment Corporation Limited >

I want to know: