FOB Price
Get Latest Price( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
-
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
The package of Hard Alloy Press Tool depends on your requirements.
Delivery Time:
45-60 working days
Supplying Ability:
30 Set per Month
Payment Type:
T/T, Western Union
Product Group :
Contact Person Mr. Eric
The fifth industry,Xiegang Town,Dongguan City, Dongguan, Guangdong
Hard Alloy Press Tool:
The lifespan of it is over ten times than steel mould in
general,the very popular material we adapted is cobalt-tungsten
carbide.
1.All punch chip use tungsten steel to stamping , The
comprehensive
service life span of the Hard Alloy Press Tool is not less than ten
million stamping
times. Tungsten steel edge should be grinded within 2 million
stampings
per time. Also we can modify some details according to
your
requires.It's flexible.
2. All prices in details are from our expert team seriously by
our
comprehensive valuation.
3.For better convenient assembly ,all our designs are the lower
cost for
maintenance , the special after-sales service, the regular
maintenance
and the grind punch chip.
4. we have our own designing and manufacturing expert team. and
it's
important to each details for us.We take very importance in every
detail
during processing.
5.we can provide design drawings 2D and 3D files to my
customers,and also
technology support.
6. we have complete test systems and instruments.
7.We hold the urgent discussion forum about the problem in the
tools
manufacture process.
8.Welcome your inspection anytime for competitive quality,and
on-time
delivery is guaranteed.
9. Safe packing for free .
*0.reasonable minimum.
More technical exchange about Hard Alloy Press Tool,please check
"condition of use" in motorcoredie dot com. Also you could leave me
message.
Country: | China |
Model No: | - |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | The package of Hard Alloy Press Tool depends on your requirements. |
Delivery Time: | 45-60 working days |
Supplying Ability: | 30 Set per Month |
Payment Type: | T/T, Western Union |
Product Group : | motor core die |