FOB Price
Get Latest Price1 ~ 2 / Set ( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
XY-2BL
FOB Price:
1 ~ 2 / Set ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
1 per Set
Minimum Order Quantity:
1 Set
Packaging Detail:
Plastic sheeting for drill rig and ply-wood for accessories
Delivery Time:
7-10 days after receiving deposit
Supplying Ability:
100 Set per Week
Payment Type:
Western Union, L/C, T/T
Product Group :
Contact Person Alvin
Chongqing, Chongqing
XY*2BL rig is developed based on our XY*2 core drilling rig , integrating drilling rig, crawler, mud pump, console rack and other devices into the integral one. It is mainly targeted at the shallow-medium hole of geology core drilling, and where the mobility is important. It is modular and integral drilling rig.
1 | Drilling depth (NQ drill rod) | Approximately **0m | ||
2 | Spindle speed | Forward | *7; *9; **7; **7; **0; **0; **2; ***4 | |
Reverse | *5; **2 r/min | |||
3 | Spindle Maximum torque | ***0 N·m | ||
4 | Spindle max pulling force | *0 KN | ||
5 | Spindle stroke | **0 mm | ||
6 | Max. lifting force of the hoist with single rope | *0 KN | ||
7 | Inner diameter of the spindle | *6 mm | ||
8 | Retraction distance | **5 mm | ||
9 | Retraction distance for the host drill rig | **0 mm | ||
*0 | Retraction distance for both drill rig and tower | **0 mm | ||
*1 | Oil pump | SCB*2/*2 double gear pump | ||
*2 | Power unit | engine power | *0 KW ***0 r/min | |
electric motor | *2 KW ***0 r/min | |||
*3 | Crawler maximum walking speed | 1.2 km/h | ||
*4 | Crawler Climbing capacity | no more than *5 ° | ||
*5 | Tracked Ground pressure | 0.**2 MPa | ||
*6 | Rig height | 8 m | ||
*7 | Hook load of the tower | *9.4 kN | ||
*8 | Max.static load of crown block beam | *8.8 kN |
Country: | China |
Model No: | XY-2BL |
FOB Price: | 1 ~ 2 / Set ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 1 per Set |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | Plastic sheeting for drill rig and ply-wood for accessories |
Delivery Time: | 7-10 days after receiving deposit |
Supplying Ability: | 100 Set per Week |
Payment Type: | Western Union, L/C, T/T |
Product Group : | drilling rig |