FOB Price
Get Latest Price( Negotiable )
|0.3 Ton Minimum Order
Country:
China
Model No:
Stainless Steel Heat Exchanger Tubes
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
0.3 Ton
Packaging Detail:
Ply-wooden Case /Iron Case/ Bundle with plastic Cap
Delivery Time:
30-60 days up to the order quantity
Supplying Ability:
1500 Ton per Month
Payment Type:
T/T, L/C, Money Gram
Product Group :
China
Contact Person gary
Tianyi, Ningbo, Zhejiang
1.PRODUCT | seamless stainless steel heat exchanger tube | ||||
2.STANDARD | ASTM,AISI,ASME,JIS,DIN,EN,GB,BS,SUS | ||||
3.MATERIAL |
|
||||
4.OD | ****1 mm | ||||
5.WT | 0.**8 mm | ||||
6.LENGTH |
1). 5.8m,6m *2m 2).random length or as customer request |
||||
7.TYPE | Seamless&welded | ||||
8.TECHNIC | Hot Rolled; Cold Rolled; Cold Drawn | ||||
9.SURFACE | Pickling,annealing,manual polish and mechanical polish , mirror polish | ||||
*0.PACKING |
Standard seaworthy package (1.plywood case2.wooden pallet package 3.bundlepackage and other package or as customer request) |
||||
*1.DELIVERY | Normally according to the order quantity or upon negotiation | ||||
*2.APPLICATION |
Stainless steel tube are widely used in below fields: 1).Petroleum,Chemical enterprise, superheater of boiler, heat exchanger 2).High temperature resistant transmission fluid pipe in power station 3).Ship with pressure pipe 4).The exhaust purification devices 5).Construction and ornament |
||||
*3.PRICE ITEM | EXW,FOB,CFR,CIF,DAF or as negotiated | ||||
*4.QULITY CONTROL |
Mill Test Certificate is supplied with shipment, Third Part Inspection is acceptable. |
||||
*5.EXPORT TO |
Southeast Asia, Mid East, Africa, Eastern Asia, Western Europe Ect | ||||
*6.AUDITED |
We are BV and SGS audited company |
Country: | China |
Model No: | Stainless Steel Heat Exchanger Tubes |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | - |
Minimum Order Quantity: | 0.3 Ton |
Packaging Detail: | Ply-wooden Case /Iron Case/ Bundle with plastic Cap |
Delivery Time: | 30-60 days up to the order quantity |
Supplying Ability: | 1500 Ton per Month |
Payment Type: | T/T, L/C, Money Gram |
Product Group : | Stainless Steel Heat Exchanger Tubes |