FOB Price
Get Latest Price16800 ~ 600000 USD / Set ( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
ZG30-ZG120
FOB Price:
16800 ~ 600000 USD / Set ( Negotiable )Get Latest Price
Place of Origin:
China
Price for Minimum Order:
16800 per Set
Minimum Order Quantity:
1 Set
Packaging Detail:
nuke package
Delivery Time:
45 days
Supplying Ability:
10 Set per Month
Payment Type:
T/T, L/C
Product Group :
Contact Person Ms. Richard
Beihu Industrial Zone, Chenzhou, Hunan
Character
1.The materials are transmitted by the steel trip to the position automatically with the focus aimed to the centre of the mould.
2.All the moulds are positioned automatically and shifted quickly without adjustment.
3. The interlock is applied to the vertical support, making the principle axis move upward and downward simultaneously. The electronic digits will show the scale of the adjustment and the parallel level, which makes the operation very convenient.
4. The principle axis takes the *2Crmo, of which the surface layer is multiinfiltrate treated, and so the strength and duration is greatly built up, doubling the service life of machine.
5. The mould is optimized in design and processed precisely with vacuum quenching and surface hardening, doubling the service life of mould.
6. Under the highly automatic electronic-control system, the machine can be operated in a key.
7. Under the tachometer signal of encoder, the pipe making speed and pipe making length can be shown on the screen.
8. The PLC program controls the speed of cutting on line of the cutting machine, whose speed keeps up with that of pipe making. And the precision of cutting can be controlled within 1mm.
9. The complete machine can be operated in linkage or in single action. When there is any secure failure, the complete machine will stop automatically so as to protect the machine from damage.
Country: | China |
Model No: | ZG30-ZG120 |
FOB Price: | 16800 ~ 600000 / Set ( Negotiable ) Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | 16800 per Set |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | nuke package |
Delivery Time: | 45 days |
Supplying Ability: | 10 Set per Month |
Payment Type: | T/T, L/C |
Product Group : | pipe making machine |