FOB Price
Get Latest Price( Negotiable )
|1 Piece Minimum Order
Country:
China
Model No:
hld004
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Piece
Packaging Detail:
standard for sea shipping (wrapping film + cardboard)
Delivery Time:
15-20days after receiving customer's down pay
Supplying Ability:
30 Piece per Month
Payment Type:
T/T
Product Group :
China
Contact Person Amy
Guangzhou, Guangdong
All
composite racking or light steel structure, with high load
capacity,
low
cost and handy construction. According to areas and
using
required the general light load capacity
that it will choose composite
racking structure, while the large span and
heavy duty load capacity
that
it will choose composite light steel
structure.
Features:
Steel
structure garretis suit for high warehouse, light
cargo,
pick
by man and large storage quantity situation, which can
increase
the
using space.
Steel
structure garretsystems are widely acceptable to
automobile
and
logistics industry. Its bottom level can be shelf form and above
flat
form
or both
shelf form.
The
bottom shelf is not only storage goods place but also support
the above level.
Can
be design many layers(usually **3 layers), and with
staircases
handrails, elevator and lighting
systems.
If
the bottom beam distance can make short, the whole system
cost
can
low down a lot too.
Country: | China |
Model No: | hld004 |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Piece |
Packaging Detail: | standard for sea shipping (wrapping film + cardboard) |
Delivery Time: | 15-20days after receiving customer's down pay |
Supplying Ability: | 30 Piece per Month |
Payment Type: | T/T |
Product Group : | mezzanine |