FOB Price
Get Latest Price900 ~ 1200 USD / Ton
|20 Ton Minimum Order
Country:
China
Model No:
XGZ-5
FOB Price:
900 ~ 1200 USD / Ton Get Latest Price
Place of Origin:
-
Price for Minimum Order:
900 per Ton
Minimum Order Quantity:
20 Ton
Packaging Detail:
in bulk or 40ft HQ and 40ft OT
Delivery Time:
within 30-45 days after deposit received
Supplying Ability:
2000 Ton per Month
Payment Type:
L/C, T/T
Product Group :
Contact Person Ms. Ann
268 Sancheng Rd,Pingdu, Qingdao, Shandong
Steel structure aircraft hangar
Project time: ***9, hangar is used as the plane repair house,
place of steel hagar is Australia, which
covers an area of ***8 M2
Steel structure aircraft hangar description:
1. Main steel structureof the steel
hangar is made in welded H steel
2. Column and beam of steel hangars: Q**5, Q**5 welding H section
steel
3. Beam: Q**5, Q**5 welding H section steel
4. Roof panel: color steel sheet with foil insulation;
5. Wall of hangar adopts Glass wool sangwich paneland thickness
is **0mm ,Both side steel panel thickness is 0.5mm white-gery
color
6. Knee brace: Q**5 angle steel
7. Vertical and transversal support: Q**5 angle steel, round bar
or steel pipe
8. Tie bar: Q**5 steel pipe
9. Brace: Q**5 round bar
*0. Sleeve: Q**5 steel pipe
*1. Cladding system: sandwich panels (EPS, PU, Fiber glass wool
etc.) or can use corrugated steel sheet with fiber glass wool
insulation and steel wire gauze
*2.Skylight sheet
*3. Door: sandwich panel sliding door
*4. Windows: Aluminum or PVC
Characteristics of steel hangar
1.Light steel structure with color sheet or sandwich panel
2. Resisting heavy wind of **0km/h and 7 grade earthquake
3. Fire proof and heat insulation performance.
4. Steel hangar is easy to assemble
5. The components can be reused when over *0 years
6. The waterproof on the roof makes the hangar a good sealing
effect
7. A concrete square can meat the requirement of the foundation
Country: | China |
Model No: | XGZ-5 |
FOB Price: | 900 ~ 1200 / Ton Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 900 per Ton |
Minimum Order Quantity: | 20 Ton |
Packaging Detail: | in bulk or 40ft HQ and 40ft OT |
Delivery Time: | within 30-45 days after deposit received |
Supplying Ability: | 2000 Ton per Month |
Payment Type: | L/C, T/T |
Product Group : | Steel Structure Hangar |