FOB Price
Get Latest Price|
1 Set Minimum Order
Country:
China
Model No:
QTZ315(7040)
FOB Price:
Place of Origin:
China(Mainland)
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
20'GP and 40'HQ Container
Delivery Time:
20 days at Qingdao Port after the advance deposit
Supplying Ability:
80 Set per Month
Payment Type:
T/T, L/C
Product Group :
Contact Person Amy
Zheshan Industrial Park,Mingshui, Jinan, Shandong
Rated Lifting Moment (KN.m)
|
***0
|
Rated Loading Capacity (t)
|
*6
|
Max. Lifting Load (t)
|
*6
|
Tip Load (t)
|
4
|
Max. Lifting Height (m)
|
**3
|
Span (m)
|
*0
|
Free Standing Height (m)
|
*8
|
Working Range (m)
|
***0
|
Rope Length (m)
|
**0
|
Lifting-jib Length (m)
|
*0
|
Counter-jib Length (m)
|
*9.**8
|
Hoisting Speed (m/min)
|
*5/*0
*0/*0
|
Trolleying Speed (m/min)
|
*0/*0/9
|
Jacking-up Speed (m/min)
|
0.4
|
Slewing Speed (r/min)
|
0.6
|
Power Supply
|
**0V/*0Hz
|
Power Capacity (Kw)
|
*9.5
|
Electric Switch Box
|
Schneider
|
Mast Section Size(L*W*H) (m)
|
2.0*2.0*3.0
|
Main Material Size (mm)
|
∠**0**6/Q**5B
|
Country: | China |
Model No: | QTZ315(7040) |
FOB Price: | Get Latest Price |
Place of Origin: | China(Mainland) |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | 20'GP and 40'HQ Container |
Delivery Time: | 20 days at Qingdao Port after the advance deposit |
Supplying Ability: | 80 Set per Month |
Payment Type: | T/T, L/C |
Product Group : | Topkit Tower Crane |