FOB Price
Get Latest Price0.85 ~ 3.69 USD /
|1000 Set Minimum Order
Country:
China
Model No:
ORN
FOB Price:
0.85 ~ 3.69 USD / Get Latest Price
Place of Origin:
-
Price for Minimum Order:
0.85
Minimum Order Quantity:
1000 Set
Packaging Detail:
in carton
Delivery Time:
2 weeks
Supplying Ability:
30000 Set per Month
Payment Type:
T/T
Product Group :
-
Contact Person Tina
Banqiao, Nanjing, Jiangsu
1.Clamps can be used in the main and branch distribution line of bare overhead conductors and insulated wire.It can replace the commonly used line Clamp. 2.Clamp structure is simple, its legs twisted wire preformed and the formation of air traffic control, rear twist for the pre-forming ring.The formation of preformed wire legs wrapped in wire can produce a very strong grip force, twist the ring to fix the insulator. |
Country: | China |
Model No: | ORN |
FOB Price: | 0.85 ~ 3.69 / Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 0.85 |
Minimum Order Quantity: | 1000 Set |
Packaging Detail: | in carton |
Delivery Time: | 2 weeks |
Supplying Ability: | 30000 Set per Month |
Payment Type: | T/T |
Product Group : | - |