FOB Price
Get Latest Price10 USD / Square Meter
|20 Square Meter Minimum Order
Country:
China
Model No:
FGM03
FOB Price:
10 USD / Square Meter Get Latest Price
Place of Origin:
Fujian,China
Price for Minimum Order:
10 per Square Meter
Minimum Order Quantity:
20 Square Meter
Packaging Detail:
carton with pallet
Delivery Time:
in 25 days
Supplying Ability:
10000 Square Meter per Week
Payment Type:
T/T, L/C, Western Union, Money Gram, PayPal
Product Group :
Contact Person Ms. Becky
Fengze, Quanzhou, Fujian
requirements. Natural texture and external clay color collect architectures rich artistic style.
6.Diversity Styles and Sizes
Leiyuan offers a variety styles and sizes for your chosen, its complete sizes through different product combination and cutting to meet designer’s style requirement
************************************************************************************************-
Terracotta Panel Installation Steps:
1.Measurement and line laying
Using a leval to mark the horizontal and vertical lines for mounting supporting poles
2.Installation of Columns
Secure columns on the main structure with brackets and stainless stell bolts, adjust the verticality of the supporting columns
3.Installation of brackets or supporting rails
Secure them on the columns with stainless steel bolts or screws, adjust the verticality and horizontality of the columns
4.Installation of terracotta panels
1) Apply the adhesive tapes on supporting rails or columns as the joint pieces
2) Position terracotta panels and clamps, adjust the verticality and horizontality of the terracotta panels by clamps
3) Mount panels from bottom up to finish the installation
5.Apply sealant
There is no need to apply sealant for open system, while for closed system is necessary to do so in the vertical and horizontal joints of terracotta panels
6.Cleanup of the Curtain Wall
Clean the installed terracotta
panels with water
requirements. Natural texture and external clay color collect
architectures rich artistic style.
6.Diversity Styles and Sizes
Leiyuan offers a variety styles and sizes for your chosen, its complete sizes through different product combination and cutting to meet designer’s style requirement
************************************************************************************************-
Terracotta Panel Installation Steps:
1.Measurement and line laying
Using a leval to mark the horizontal and vertical lines for mounting supporting poles
2.Installation of Columns
Secure columns on the main structure with brackets and stainless stell bolts, adjust the verticality of the supporting columns
3.Installation of brackets or supporting rails
Secure them on the columns with stainless steel bolts or screws, adjust the verticality and horizontality of the columns
4.Installation of terracotta panels
1) Apply the adhesive tapes on supporting rails or columns as the joint pieces
2) Position terracotta panels and clamps, adjust the verticality and horizontality of the terracotta panels by clamps
3) Mount panels from bottom up to finish the installation
5.Apply sealant
There is no need to apply sealant for open system, while for closed system is necessary to do so in the vertical and horizontal joints of terracotta panels
6.Cleanup of the Curtain Wall
Clean the installed terracotta panels with water
Country: | China |
Model No: | FGM03 |
FOB Price: | 10 / Square Meter Get Latest Price |
Place of Origin: | Fujian,China |
Price for Minimum Order: | 10 per Square Meter |
Minimum Order Quantity: | 20 Square Meter |
Packaging Detail: | carton with pallet |
Delivery Time: | in 25 days |
Supplying Ability: | 10000 Square Meter per Week |
Payment Type: | T/T, L/C, Western Union, Money Gram, PayPal |
Product Group : | floor and wall tiles |